Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Ponda, Goa.
Ponda at a glance for solar projects
| District and state | South Goa district, Goa |
|---|---|
| Electricity supply | Electricity Department, Government of Goa (ED Goa) supplies Ponda, which the cited source places in its supply area. |
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
| State renewable energy agency | Goa Energy Development Agency (GEDA) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,310 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1520 km from Ponda in a straight line |
Solar services in Ponda
- Solar EPC Company in Ponda
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Ponda
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Ponda
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Ponda
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Ponda
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Ponda
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Ponda
The Government of India's One District One Product (ODOP) list names Feni and Cashew Nuts as the products of South Goa district.
Solar output in Ponda
A solar plant in Ponda is modelled to produce about 1,310 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹5.60 per kVAh (JERC Tariff Order of 30 September 2025 for the Electricity Department, Government of Goa (Petition No. 141/2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹5.60 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹280 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge from 09:00 to 17:00, 1.2 times from 17:00 to 01:00 and the normal charge from 01:00 to 09:00. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹5.50 per kVAh with a fixed charge of ₹275 per kVA per month. A later JERC order of 6 May 2026 only trued up FY 2024-25 and did not change this tariff. The Electricity Department, Government of Goa is the licensee the order covers.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.60 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹7.3 lakh |
| 500 kW | 6.5 lakh units | 5,000 sq m | ₹36.7 lakh |
| 1 MW | 13.1 lakh units | 10,000 sq m | ₹73.4 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Ponda
For a rooftop array in Ponda the strongest month is March, at about 139 units for each kW installed, and the weakest is July, at about 68. For a ground-mounted array at a 22° tilt the strongest month is January (about 147) and the weakest is July (about 64). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 133 | 147 |
| February | 128 | 136 |
| March | 139 | 141 |
| April | 130 | 125 |
| May | 122 | 113 |
| June | 77 | 71 |
| July | 68 | 64 |
| August | 80 | 77 |
| September | 90 | 89 |
| October | 108 | 112 |
| November | 114 | 124 |
| December | 124 | 138 |
Somaya Solar projects near Ponda
These are the Somaya Solar projects closest to Ponda, with straight-line distances. They are shown as references and are not in Ponda unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1150 km from Ponda. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1510 km from Ponda. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1570 km from Ponda. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Ponda
Which electricity company handles solar connections in Ponda?
Electricity Department, Government of Goa (ED Goa) supplies Ponda, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Ponda?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.
How much electricity does a solar plant generate in Ponda?
About 1,310 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Ponda?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1520 km from Ponda in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1150 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ponda
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- ED Goa: source naming Ponda within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- Goa Energy Development Agency, model Power Purchase Agreement for PM-KUSUM Component A (recital C), and Government of Goa press release of 14 August 2026
- Government of Goa, Department of Revenue, Notification 16/29/1/2023-Rev-I/3259 of 31 December 2025 (Official Gazette, Series I No. 39, Extraordinary No. 2): districts, sub-divisions, talukas and villages
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order for the Electricity Department, Government of Goa, Petition No. 141/2025, dated 30 September 2025 (section 1.1)
- JERC Tariff Order, Aggregate Revenue Requirement and Determination of Retail Tariff for the 4th MYT Control Period (FY 2025-26 to FY 2029-30), Petition No. 141/2025, Electricity Department, Government of Goa, dated 30 September 2025
- PVGIS, European Commission Joint Research Centre (solar output model)