Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Panjim, Goa.

Panjim at a glance for solar projects

District and stateNorth Goa district, Goa
Electricity supplyElectricity Department, Government of Goa (ED Goa) supplies Panjim, which the cited source places in its supply area.
Electricity regulatorJoint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC)
State renewable energy agencyGoa Energy Development Agency (GEDA)
Rooftop metering for businessesNet metering up to 500 kWp, within the sanctioned load
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1510 km from Panjim in a straight line

Solar services in Panjim

Local points for solar projects in Panjim

The Government of India's One District One Product (ODOP) list names Cashew Nuts and Feni as the products of North Goa district.

Solar output in Panjim

A solar plant in Panjim is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹5.60 per kVAh (JERC Tariff Order of 30 September 2025 for the Electricity Department, Government of Goa (Petition No. 141/2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹5.60 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹280 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge from 09:00 to 17:00, 1.2 times from 17:00 to 01:00 and the normal charge from 01:00 to 09:00. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹5.50 per kVAh with a fixed charge of ₹275 per kVA per month. A later JERC order of 6 May 2026 only trued up FY 2024-25 and did not change this tariff. The Electricity Department, Government of Goa is the licensee the order covers.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.60 per kVAh
100 kW1.4 lakh units1,000 sq m₹7.6 lakh
500 kW6.8 lakh units5,000 sq m₹38.1 lakh
1 MW13.6 lakh units10,000 sq m₹76.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Panjim

For a rooftop array in Panjim the strongest month is March, at about 146 units for each kW installed, and the weakest is July, at about 73. For a ground-mounted array at a 21° tilt the strongest month is January (about 147) and the weakest is July (about 68). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January134147
February131139
March146147
April135131
May126118
June8075
July7368
August8682
September9695
October113116
November117126
December126139

Somaya Solar projects near Panjim

These are the Somaya Solar projects closest to Panjim, with straight-line distances. They are shown as references and are not in Panjim unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1150 km from Panjim. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1510 km from Panjim. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1560 km from Panjim. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Panjim

Which electricity company handles solar connections in Panjim?

Electricity Department, Government of Goa (ED Goa) supplies Panjim, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Panjim?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.

How much electricity does a solar plant generate in Panjim?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Panjim?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1510 km from Panjim in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1150 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Panjim

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.