Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Goa.
Goa at a glance for solar projects
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
|---|---|
| State renewable energy agency | Goa Energy Development Agency (GEDA) |
| Electricity distribution | ED Goa (Goa; it is the distribution licensee named in JERC's tariff orders for Goa) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
Solar services in Goa
- Solar EPC Company in Goa
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Goa
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Goa
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Goa
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Goa
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Goa
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Goa
Solar output changes across Goa with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,380 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Curchorem | 1,320 | 1,340 |
| Madgaon | 1,360 | 1,380 |
| Mapusa | 1,330 | 1,350 |
| Panjim | 1,360 | 1,380 |
| Ponda | 1,310 | 1,340 |
| Sancoale | 1,350 | 1,370 |
| Vasco da Gama | 1,380 | 1,400 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Goa
Questions about solar projects in Goa
Is net metering available for factories and commercial buildings in Goa?
In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Goa
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Goa Energy Development Agency, model Power Purchase Agreement for PM-KUSUM Component A (recital C), and Government of Goa press release of 14 August 2026
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order for the Electricity Department, Government of Goa, Petition No. 141/2025, dated 30 September 2025 (section 1.1)
- JERC Tariff Order for the Electricity Department, Government of Goa, Petition No. 141/2025, dated 30 September 2025 (sections 1.2 and 1.3)
- PVGIS, European Commission Joint Research Centre (solar output model)