Turnkey Solar EPC Solutions in Goa

Somaya Solar Solutions Limited delivers turnkey solar projects in Goa: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Goa

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Goa

In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

  • Under net billing, power drawn from the grid is charged at the retail tariff and solar power sent to the grid is valued at the feed-in tariff set by the Commission.
  • Gross metering is allowed for a consumer or generator who chooses to sell all the solar power to the distribution licensee at the feed-in tariff set by the Commission.
  • The total solar capacity connected to one distribution transformer may not exceed 75% of that transformer's capacity. The licensee may allow more after a detailed load study.
  • Under net metering, surplus units carry forward to the next billing period. Units still unadjusted at the end of the financial year are bought by the licensee at its average power purchase cost or the feed-in tariff, whichever is lower.
  • Group net metering is open to all consumers. Virtual net metering is for residential consumers, group housing societies and establishments of government or local authorities. Under both, the plant may be up to 500 kWp or the sanctioned load, whichever is lower.
  • A consumer may lease the roof or land to a solar developer under net metering. Plants under these regulations are exempt from open access charges and from banking charges.
  • The licensee must finish the technical feasibility study within 15 working days. An application for a plant up to 10 kW is deemed accepted without the study.
  • Latest amendment: the First Amendment Regulations, 2024, notified on 1 August 2024 and published in the Gazette of India on 11 September 2024.

What to expect from the plant in Goa

Solar output changes across Goa with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,380 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Curchorem1,3201,340
Madgaon1,3601,380
Mapusa1,3301,350
Panjim1,3601,380
Ponda1,3101,340
Sancoale1,3501,370
Vasco da Gama1,3801,400

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Goa

Is net metering available for factories and commercial buildings in Goa?

In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Goa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image