Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Balotra, Rajasthan.

Balotra at a glance for solar projects

District and stateBalotra district, Rajasthan
Electricity supplyJodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies Balotra, which the cited source places in its supply area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,490 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 600 km from Balotra in a straight line

Solar services in Balotra

Balotra: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Balotra 1st to 4th Phase, Balotra Phase I, Balotra Phase II, Balotra Phase III, Balotra Phase III EXT and Balotra Phase IV among its industrial areas in Balotra district.

The Government of India's One District One Product (ODOP) list names Textile Products as the product of Balotra district.

Solar output in Balotra

A solar plant in Balotra is modelled to produce about 1,490 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.5 lakh units1,000 sq m₹9.7 lakh
500 kW7.5 lakh units5,000 sq m₹48.4 lakh
1 MW14.9 lakh units10,000 sq m₹96.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Balotra

For a rooftop array in Balotra the strongest month is May, at about 153 units for each kW installed, and the weakest is August, at about 95. For a ground-mounted array at a 30° tilt the strongest month is March (about 153) and the weakest is August (about 90). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January122150
February122141
March145153
April148143
May153138
June132116
July10495
August9590
September115117
October129143
November114137
December115146

Somaya Solar projects near Balotra

These are the Somaya Solar projects closest to Balotra, with straight-line distances. They are shown as references and are not in Balotra unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 700 km from Balotra. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 730 km from Balotra. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 740 km from Balotra. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Balotra

Which electricity company handles solar connections in Balotra?

Jodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies Balotra, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Balotra?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Balotra?

About 1,490 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Balotra?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 600 km from Balotra in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 700 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Balotra

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image