Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Banswara, Rajasthan.

Banswara at a glance for solar projects

District and stateBanswara district, Rajasthan
Electricity supplyAjmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Banswara district, one of the districts it lists as its area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,380 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 640 km from Banswara in a straight line

Solar services in Banswara

Banswara: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Pipalwa Banswara among its industrial areas in Banswara district.

The Government of India's One District One Product (ODOP) list names Marble Products as the product of Banswara district.

Solar output in Banswara

A solar plant in Banswara is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.0 lakh
500 kW6.9 lakh units5,000 sq m₹44.9 lakh
1 MW13.8 lakh units10,000 sq m₹89.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Banswara

For a rooftop array in Banswara the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 70. For a ground-mounted array at a 29° tilt the strongest month is March (about 150) and the weakest is July (about 66). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January122147
February123139
March144150
April145139
May147132
June113100
July7266
August7066
September9596
October125136
November113133
December113139

Somaya Solar projects near Banswara

These are the Somaya Solar projects closest to Banswara, with straight-line distances. They are shown as references and are not in Banswara unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 610 km from Banswara. Completed, including the transmission line work coordinated with the local distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 720 km from Banswara. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 730 km from Banswara. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.

See all published projects

Questions about solar projects in Banswara

Which electricity company handles solar connections in Banswara?

Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Banswara district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Banswara?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Banswara?

About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Banswara?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 640 km from Banswara in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 610 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Banswara

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image