Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Baramula, Jammu and Kashmir. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Baramula

The Government of India's One District One Product (ODOP) list names Apples as the product of Baramulla district.

Metering rules for business rooftops in Baramula

In Jammu and Kashmir, eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The rules are in JERC's Grid Interactive Renewable Energy System regulations, 2023 (notified on 29 May 2023). They were amended once, on 28 June 2024.

The size limits, charges and other conditions for Jammu and Kashmir are on the page Commercial & Industrial Solar in Jammu and Kashmir.

In Baramula the application for connection and metering goes to KPDCL.

Output and bill value for a rooftop plant in Baramula

A solar plant in Baramula is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial Supply (Schedule 6), 11 kV, sanctioned load above 100 kW and up to 1 MVA energy charge of ₹4.50 per kVAh (JERC tariff order No. 06 of 2026 for JPDCL and KPDCL, dated 20 August 2026, applicable to energy used from 1 September 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule covers both JPDCL and KPDCL. A demand charge of ₹184 per kVA per month also applies, on billing demand. The energy charge is 10 paise lower at 33 kV and 20 paise lower at 66 kV and above. Time-of-day tariff applies: a 20% surcharge on energy charges from 6 am to 9 am and from 5 pm to 10 pm, and a 20% rebate from 9 am to 5 pm. These are the subsidised rates that the licensees must bill; the order counts ₹2,420.78 crore of support from the UT government. HT power-intensive industries (Schedule 7) pay ₹5.30 per kVAh at 11 kV and ₹5.25 at 33 kV, with a demand charge of ₹236 per kVA per month.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kVAh
100 kW1.4 lakh units1,000 sq m₹6.4 lakh
250 kW3.5 lakh units2,500 sq m₹16.0 lakh
500 kW7.1 lakh units5,000 sq m₹31.9 lakh
1 MW14.2 lakh units10,000 sq m₹63.9 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Baramula

These are the Somaya Solar projects closest to Baramula, with straight-line distances. They are shown as references and are not in Baramula unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 590 km from Baramula. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 590 km from Baramula. Included net-metering coordination with the local electricity distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 710 km from Baramula. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Baramula

Which electricity company handles solar connections in Baramula?

Kashmir Power Distribution Corporation Limited (KPDCL) supplies electricity in Baramulla district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Baramula?

Net metering up to 500 kW; net billing above 500 kW up to 1 MW. The rule is the same across Jammu and Kashmir.

How much electricity does a solar plant generate in Baramula?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Baramula?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 680 km from Baramula in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 590 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Baramula

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.