Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Baramula, Jammu and Kashmir as an EPC contractor: engineering, supply, construction and commissioning.
What Jammu and Kashmir's policy says about large solar plants
Under JERC's Green Energy Open Access Regulations, 2024 (notified on 12 February 2024), a consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or on several in the same electricity division, can take green energy through open access. A captive consumer has no load limit.
The charges, exemptions and conditions for Jammu and Kashmir are on the page Utility-Scale Solar in Jammu and Kashmir.
Output and land at megawatt scale in Baramula
A solar plant in Baramula is modelled to produce about 1,540 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (36°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 77.0 lakh units | 20 to 25 acres |
| 10 MW | 1.54 crore units | 40 to 50 acres |
| 25 MW | 3.85 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Baramula
These are the Somaya Solar projects closest to Baramula, with straight-line distances. They are shown as references and are not in Baramula unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 710 km from Baramula. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1290 km from Baramula. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Baramula
Which electricity company handles solar connections in Baramula?
Kashmir Power Distribution Corporation Limited (KPDCL) supplies electricity in Baramulla district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Baramula?
About 1,540 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.4 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Baramula?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 680 km from Baramula in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 710 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Baramula
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- J&K Official Gazette, S.O. 109 of 20 March 2020 (First Transfer Scheme), definitions and distribution undertakings
- JERC (Green Energy Open Access) Regulations, 2024, notified 12 February 2024; JERC order No. 06 of 2026 dated 20 August 2026 for JPDCL and KPDCL (paras 7.33, 7.38, 7.44-7.45, 7.49)
- PVGIS, European Commission Joint Research Centre (solar output model)