Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Bardoli, Gujarat.

Bardoli at a glance for solar projects

District and stateSurat district, Gujarat
Electricity supplyDakshin Gujarat Vij Company Limited (DGVCL) supplies electricity in Surat district, one of the districts it lists as its area.
Electricity regulatorGujarat Electricity Regulatory Commission (GERC)
State renewable energy agencyGujarat Energy Development Agency (GEDA)
State solar policyGujarat Integrated Renewable Energy Policy - 2025 (issued 24 December 2025)
Rooftop metering for businessesNet metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC)
Modelled solar outputabout 1,380 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 940 km from Bardoli in a straight line

Solar services in Bardoli

Bardoli: industrial areas

The MSME Development Institute's industrial profile of Surat district (Government of India, from GIDC data) lists a GIDC estate at Bardoli.

The Government of India's One District One Product (ODOP) list names Gems and Jewellery, Zari and Zardozi and Sadeli as the products of Surat district.

Solar output in Bardoli

A solar plant in Bardoli is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.20 per kWh
100 kW1.4 lakh units1,000 sq m₹5.8 lakh
500 kW6.9 lakh units5,000 sq m₹29.0 lakh
1 MW13.8 lakh units10,000 sq m₹58.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Bardoli

For a rooftop array in Bardoli the strongest month is March, at about 144 units for each kW installed, and the weakest is July, at about 72. For a ground-mounted array at a 27° tilt the strongest month is January (about 148) and the weakest is July (about 66). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January126148
February124138
March144148
April143137
May144130
June10493
July7266
August7773
September9090
October121130
November115131
December116138

Somaya Solar projects near Bardoli

These are the Somaya Solar projects closest to Bardoli, with straight-line distances. They are shown as references and are not in Bardoli unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 810 km from Bardoli. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1020 km from Bardoli. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1020 km from Bardoli. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Bardoli

Which electricity company handles solar connections in Bardoli?

Dakshin Gujarat Vij Company Limited (DGVCL) supplies electricity in Surat district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Bardoli?

Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.

How much electricity does a solar plant generate in Bardoli?

About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Bardoli?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 940 km from Bardoli in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 810 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bardoli

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.