Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gujarat.

Gujarat at a glance for solar projects

Electricity regulatorGujarat Electricity Regulatory Commission (GERC)
State renewable energy agencyGujarat Energy Development Agency (GEDA)
Electricity distributionDGVCL (South Gujarat: the districts of Bharuch, Narmada, Surat (except part of Surat city), Tapi, Dangs, Navsari and Valsad. Head office in Surat.); MGVCL (Central Gujarat: Vadodara, Chhota Udepur, Anand, Kheda, Panchmahal, Dahod and Mahisagar. Head office in Vadodara.); PGVCL (Western Gujarat, with circle offices at Rajkot (city and rural), Morbi, Jamnagar, Porbandar, Junagadh, Amreli, Bhavnagar, Botad, Surendranagar, Bhuj and Anjar. Head office in Rajkot.); UGVCL (North Gujarat: Mehsana, Patan, Banaskantha, Sabarkantha and Arvalli, and parts of Ahmedabad, Gandhinagar, Kheda, Anand and Surendranagar districts outside the areas of other licensees. Head office in Mehsana.); Torrent Power (Ahmedabad) (Ahmedabad city and Gandhinagar city.); Torrent Power (Surat) (Surat city.); Torrent Power (Dahej) (Dahej Special Economic Zone, Bharuch district.); Torrent Power (Dholera) (Dholera Special Investment Region supply area.); MUL (Mundra SEZ (Kutch district).); GIFT PCL (GIFT City, Gandhinagar (both the SEZ and the domestic tariff area).); AIVPL (Aspen SEZ at Village Pipaliya, Waghodia taluka, Vadodara district.); JIL (Jubilant chemicals SEZ at Vilayat, Bharuch district.)
State solar policyGujarat Integrated Renewable Energy Policy - 2025 (issued 24 December 2025)
Rooftop metering for businessesNet metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC)

Solar services in Gujarat

Solar output by place in Gujarat

Solar output changes across Gujarat with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,350 to 1,520 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Ahmedabad1,4101,470
Amreli1,4101,460
Anand1,4001,460
Anjar1,4701,530
Anklav1,3901,450
Ankleshwar1,4101,460
Babra1,4101,460
Bagasra1,4301,490
Bardoli1,3801,420
Bhachau1,4701,530
Bhanvad1,4401,490
Bharuch1,4101,460
Bhavnagar1,4201,480
Bholav1,3801,430
Bhuj1,5101,570
Bilimora1,4201,460
Borsad1,4101,460
Botad1,4101,470
Chaklasi1,4001,460
Chhaya1,4601,510
Chhota Udepur1,3901,440
Chorwad1,4801,520
Dabhoi1,3801,430
Dahegam1,4101,470
Dakor1,3901,450
Deesa1,4301,490
Devgadh Bariya1,3901,440
Dhanera1,4401,510
Dharampur1,3601,400
Dhari1,4401,490
Dhoraji1,4101,460
Dhrol1,4401,500
Dohad1,3801,440
Dwarka1,5201,570
Gadhada1,4101,460
Gadkhol1,3801,430
Gandhidham1,4701,530
Gariadhar1,4101,460
Godhra1,3901,450
Gondal1,4101,460
Halol1,3901,440
Halvad1,4401,500
Harij1,4301,490
Himatnagar1,4101,480
Idar1,4101,480
Jafarabad1,4901,540
Jambusar1,4101,460
Jamjodhpur1,4201,470
Jamnagar1,4401,500
Jasdan1,4201,480
Jetpur1,4101,460
Jhadeshwar1,3801,430
Jhalod1,3801,440
Junagadh1,4101,460
Kadi1,4201,480
Kalavad1,4101,470
Kalol1,4201,480
Kapadvanj1,4001,460
Karjan1,3901,440
Kathlal1,4001,460
Keshod1,4501,500
Khambhaliya1,4501,510
Khambhat1,4101,470
Kheda1,4101,460
Khedbrahma1,4101,480
Kheralu1,4201,480
Kodinar1,4901,540
Kotharia1,4201,480
Lathi1,4101,470
Lunavada1,4001,460
Madhapar1,5101,570
Mahemdavad1,4001,460
Mahesana1,4201,480
Mahuva1,4701,520
Manavadar1,4501,500
Mandvi1,5201,580
Mangrol1,4801,520
Mansa1,4101,480
Modasa1,4101,470
Morvi1,4401,500
Nadiad1,4001,460
Navsari1,4101,460
Okha1,5101,570
Padra1,3901,440
Palanpur1,4201,490
Palitana1,4101,460
Pardi1,3901,440
Patan1,4201,490
Petlad1,4101,460
Porbandar1,4601,510
Prantij1,4101,470
Radhanpur1,4401,500
Rajkot1,4301,480
Rajpipla1,3701,420
Rajula1,4601,510
Ranavav1,4601,510
Rapar1,4701,540
Salaya1,4601,510
Savarkundla1,4301,480
Siddhapur1,4201,490
Sihor1,4101,460
Sikka1,4401,500
Songadh1,3601,410
Surat1,4201,460
Sutrapara1,5001,550
Talaja1,4401,490
Talala1,4701,510
Umargam1,3701,410
Umreth1,4001,450
Una1,4801,530
Unjha1,4201,480
Upleta1,4101,470
Vadali1,4101,480
Vadnagar1,4101,480
Vadodara1,3901,440
Vallabh Vidyanagar1,4001,460
Valsad1,4001,440
Vapi1,3701,420
Veraval1,4901,530
Vijalpor1,4101,460
Vijapur1,4101,480
Visnagar1,4101,480
Vyara1,3501,400
Wankaner1,4401,490

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Places we cover in Gujarat

Questions about solar projects in Gujarat

Is net metering available for factories and commercial buildings in Gujarat?

Since 30 October 2026, new rooftop and other distributed renewable systems in Gujarat come under GERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2026. They replace the Net Metering Rooftop Solar PV Regulations, 2016, last amended by the fifth amendment of 3 November 2025. Every consumer category may choose net metering, net billing, gross metering, group net metering or virtual net metering. Systems installed under the 2016 regulations stay under those rules and their agreements.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gujarat

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.