Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Bhuj, Gujarat.
Bhuj at a glance for solar projects
| District and state | Kachchh district, Gujarat |
|---|---|
| Electricity supply | Paschim Gujarat Vij Company Limited (PGVCL) supplies Bhuj, which the cited source places in its supply area. |
| Electricity regulator | Gujarat Electricity Regulatory Commission (GERC) |
| State renewable energy agency | Gujarat Energy Development Agency (GEDA) |
| State solar policy | Gujarat Integrated Renewable Energy Policy - 2025 (issued 24 December 2025) |
| Rooftop metering for businesses | Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC) |
| Modelled solar output | about 1,510 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 980 km from Bhuj in a straight line |
Solar services in Bhuj
- Solar EPC Company in Bhuj
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Bhuj
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Bhuj
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Bhuj
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Bhuj
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Bhuj
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Bhuj
The Government of India's One District One Product (ODOP) list names Handicraft Items, Green Dates, Salt and Bhujodi Shawl weaving among the products of Kachchh district.
Solar output in Bhuj
A solar plant in Bhuj is modelled to produce about 1,510 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.20 per kWh |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹6.3 lakh |
| 500 kW | 7.5 lakh units | 5,000 sq m | ₹31.7 lakh |
| 1 MW | 15.1 lakh units | 10,000 sq m | ₹63.4 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Bhuj
For a rooftop array in Bhuj the strongest month is May, at about 154 units for each kW installed, and the weakest is August, at about 94. For a ground-mounted array at a 28° tilt the strongest month is January (about 156) and the weakest is July (about 89). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 129 | 156 |
| February | 127 | 143 |
| March | 149 | 155 |
| April | 150 | 144 |
| May | 154 | 139 |
| June | 127 | 113 |
| July | 97 | 89 |
| August | 94 | 89 |
| September | 111 | 112 |
| October | 132 | 144 |
| November | 119 | 139 |
| December | 122 | 148 |
Somaya Solar projects near Bhuj
These are the Somaya Solar projects closest to Bhuj, with straight-line distances. They are shown as references and are not in Bhuj unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1080 km from Bhuj. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1090 km from Bhuj. Completed, including the transmission line work coordinated with the local distribution company.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1120 km from Bhuj. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Bhuj
Which electricity company handles solar connections in Bhuj?
Paschim Gujarat Vij Company Limited (PGVCL) supplies Bhuj, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Bhuj?
Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.
How much electricity does a solar plant generate in Bhuj?
About 1,510 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Bhuj?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 980 km from Bhuj in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 1080 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bhuj
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- District Kachchh website: Municipalities
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 (Notification No. 11 of 2026, Gujarat Government Gazette of 30 October 2026) and Statement of Reasons; GERC Green Energy Open Access (Sixth Amendment) Regulations, 2026, notified 19 August 2026
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified 30 October 2026 (regulation 7.2 and model agreements: projects register with GEDA or another agency the Government of Gujarat designates); GERC Order No. 04 of 2026 (small hydro), September 2026
- GERC tariff schedule of the four state-owned distribution companies, effective 1 April 2026 (Part II, rate HTP-I); GERC tariff schedules of TPL-D (A), TPL-D (S) and TPL-D (Dahej), effective 1 April 2026
- GeoNames (place coordinates, CC BY 4.0)
- Gujarat Electricity Regulatory Commission
- MNRE, Policy & Regulatory Updates, December 2025 (section VI, Gujarat); GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 and their Statement of Reasons, 30 October 2026
- PGVCL: source naming Bhuj within its supply area
- PVGIS, European Commission Joint Research Centre (solar output model)