Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Dwarka, Gujarat.
Dwarka at a glance for solar projects
| District and state | Devbhumi Dwarka district, Gujarat |
|---|---|
| Electricity supply | Paschim Gujarat Vij Company Limited (PGVCL) supplies Dwarka, which the cited source places in its supply area. |
| Electricity regulator | Gujarat Electricity Regulatory Commission (GERC) |
| State renewable energy agency | Gujarat Energy Development Agency (GEDA) |
| State solar policy | Gujarat Integrated Renewable Energy Policy - 2025 (issued 24 December 2025) |
| Rooftop metering for businesses | Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC) |
| Modelled solar output | about 1,520 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1110 km from Dwarka in a straight line |
Solar services in Dwarka
- Solar EPC Company in Dwarka
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Dwarka
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Dwarka
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Dwarka
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Dwarka
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Dwarka
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Dwarka
The Government of India's One District One Product (ODOP) list names Marine & Fisheries/ Dholdara Fish, Khambhaliya Shawl and Salt as the products of Devbhumi Dwarka district.
Solar output in Dwarka
A solar plant in Dwarka is modelled to produce about 1,520 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.20 per kWh |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹6.4 lakh |
| 500 kW | 7.6 lakh units | 5,000 sq m | ₹31.9 lakh |
| 1 MW | 15.2 lakh units | 10,000 sq m | ₹63.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Dwarka
For a rooftop array in Dwarka the strongest month is April, at about 153 units for each kW installed, and the weakest is July, at about 96. For a ground-mounted array at a 27° tilt the strongest month is March (about 158) and the weakest is July (about 88). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 132 | 157 |
| February | 129 | 144 |
| March | 152 | 158 |
| April | 153 | 147 |
| May | 152 | 138 |
| June | 121 | 108 |
| July | 96 | 88 |
| August | 101 | 96 |
| September | 108 | 108 |
| October | 133 | 144 |
| November | 120 | 139 |
| December | 123 | 148 |
Somaya Solar projects near Dwarka
These are the Somaya Solar projects closest to Dwarka, with straight-line distances. They are shown as references and are not in Dwarka unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1180 km from Dwarka. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1210 km from Dwarka. In progress. Site access was difficult and was handled with local support.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1250 km from Dwarka. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Dwarka
Which electricity company handles solar connections in Dwarka?
Paschim Gujarat Vij Company Limited (PGVCL) supplies Dwarka, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Dwarka?
Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.
How much electricity does a solar plant generate in Dwarka?
About 1,520 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dwarka?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1110 km from Dwarka in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1180 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dwarka
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- District Devbhumi Dwarka website: Municipalities
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 (Notification No. 11 of 2026, Gujarat Government Gazette of 30 October 2026) and Statement of Reasons; GERC Green Energy Open Access (Sixth Amendment) Regulations, 2026, notified 19 August 2026
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified 30 October 2026 (regulation 7.2 and model agreements: projects register with GEDA or another agency the Government of Gujarat designates); GERC Order No. 04 of 2026 (small hydro), September 2026
- GERC tariff schedule of the four state-owned distribution companies, effective 1 April 2026 (Part II, rate HTP-I); GERC tariff schedules of TPL-D (A), TPL-D (S) and TPL-D (Dahej), effective 1 April 2026
- GeoNames (place coordinates, CC BY 4.0)
- Gujarat Electricity Regulatory Commission
- MNRE, Policy & Regulatory Updates, December 2025 (section VI, Gujarat); GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 and their Statement of Reasons, 30 October 2026
- PGVCL: source naming Dwarka within its supply area
- PVGIS, European Commission Joint Research Centre (solar output model)