Ground-Mounted Solar Power Plant in Gujarat

Somaya Solar Solutions Limited builds ground-mounted solar power plants in Gujarat for businesses that want their own power and for landowners and developers who sell power to the grid.

Output and land for a ground-mounted plant in Gujarat

Solar output changes across Gujarat with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,400 to 1,580 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Ahmedabad1,4101,470
Amreli1,4101,460
Anand1,4001,460
Anjar1,4701,530
Anklav1,3901,450
Ankleshwar1,4101,460
Babra1,4101,460
Bagasra1,4301,490
Bardoli1,3801,420
Bhachau1,4701,530
Bhanvad1,4401,490
Bharuch1,4101,460
Bhavnagar1,4201,480
Bholav1,3801,430
Bhuj1,5101,570
Bilimora1,4201,460
Borsad1,4101,460
Botad1,4101,470
Chaklasi1,4001,460
Chhaya1,4601,510
Chhota Udepur1,3901,440
Chorwad1,4801,520
Dabhoi1,3801,430
Dahegam1,4101,470
Dakor1,3901,450
Deesa1,4301,490
Devgadh Bariya1,3901,440
Dhanera1,4401,510
Dharampur1,3601,400
Dhari1,4401,490
Dhoraji1,4101,460
Dhrol1,4401,500
Dohad1,3801,440
Dwarka1,5201,570
Gadhada1,4101,460
Gadkhol1,3801,430
Gandhidham1,4701,530
Gariadhar1,4101,460
Godhra1,3901,450
Gondal1,4101,460
Halol1,3901,440
Halvad1,4401,500
Harij1,4301,490
Himatnagar1,4101,480
Idar1,4101,480
Jafarabad1,4901,540
Jambusar1,4101,460
Jamjodhpur1,4201,470
Jamnagar1,4401,500
Jasdan1,4201,480
Jetpur1,4101,460
Jhadeshwar1,3801,430
Jhalod1,3801,440
Junagadh1,4101,460
Kadi1,4201,480
Kalavad1,4101,470
Kalol1,4201,480
Kapadvanj1,4001,460
Karjan1,3901,440
Kathlal1,4001,460
Keshod1,4501,500
Khambhaliya1,4501,510
Khambhat1,4101,470
Kheda1,4101,460
Khedbrahma1,4101,480
Kheralu1,4201,480
Kodinar1,4901,540
Kotharia1,4201,480
Lathi1,4101,470
Lunavada1,4001,460
Madhapar1,5101,570
Mahemdavad1,4001,460
Mahesana1,4201,480
Mahuva1,4701,520
Manavadar1,4501,500
Mandvi1,5201,580
Mangrol1,4801,520
Mansa1,4101,480
Modasa1,4101,470
Morvi1,4401,500
Nadiad1,4001,460
Navsari1,4101,460
Okha1,5101,570
Padra1,3901,440
Palanpur1,4201,490
Palitana1,4101,460
Pardi1,3901,440
Patan1,4201,490
Petlad1,4101,460
Porbandar1,4601,510
Prantij1,4101,470
Radhanpur1,4401,500
Rajkot1,4301,480
Rajpipla1,3701,420
Rajula1,4601,510
Ranavav1,4601,510
Rapar1,4701,540
Salaya1,4601,510
Savarkundla1,4301,480
Siddhapur1,4201,490
Sihor1,4101,460
Sikka1,4401,500
Songadh1,3601,410
Surat1,4201,460
Sutrapara1,5001,550
Talaja1,4401,490
Talala1,4701,510
Umargam1,3701,410
Umreth1,4001,450
Una1,4801,530
Unjha1,4201,480
Upleta1,4101,470
Vadali1,4101,480
Vadnagar1,4101,480
Vadodara1,3901,440
Vallabh Vidyanagar1,4001,460
Valsad1,4001,440
Vapi1,3701,420
Veraval1,4901,530
Vijalpor1,4101,460
Vijapur1,4101,480
Visnagar1,4101,480
Vyara1,3501,400
Wankaner1,4401,490

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

State policy and open access in Gujarat

The Gujarat Integrated Renewable Energy Policy - 2025 is the state's current policy for solar, wind, hybrid and battery storage projects. The Government of Gujarat issued it on 24 December 2025. GERC's distributed renewable energy regulations of October 2026 list it among the rules a rooftop or distributed project must follow.

  • Target: more than 100 GW of renewable capacity by 2030, more than 150 GW by 2035 and 300 GW by 2047.
  • GERC records that the policy names GUVNL, the state holding company of the four distribution companies, as the agency that implements, coordinates and monitors it. Rooftop and other distributed projects register with GEDA under GERC's regulations.
  • For commercial and industrial consumers the policy allows group net metering and virtual net metering for rooftop solar, gives a longer commissioning period for captive and third-party projects, and lets consumers who are not obligated entities claim the renewable attributes.
  • Projects sanctioned under the earlier Renewable Energy Policy 2023 may finish within their agreement timeline or 6 months, whichever is later.

Under GERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or several in the same electricity division, can buy renewable power through open access. A captive consumer has no minimum load.

  • There is no limit on the size of a captive renewable plant compared with the consumer's contract demand.
  • Banking is settled within each billing cycle and cannot be carried forward. The banking charge is ₹1.00 per unit from 1 September 2026 to 31 March 2027. After that GERC sets it each year by a formula, between ₹0.50 and ₹1.50 per unit.
  • For 2026-27 the cross-subsidy surcharge for HT consumers of the four state companies is ₹1.33 per unit. The additional surcharge is ₹0.99 per unit from 1 October 2026 to 31 March 2027 (it was ₹0.76 from April to September 2026). Neither applies to a captive plant.
  • The wheeling charge on the state companies' HT network (11 kV to 33 kV) is 23.52 paise per unit for 2026-27.

What a ground-mounted project involves

A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.

  • Land check: title, slope, soil, drainage, access road and shading
  • Distance to the substation or connection point and the line needed to reach it
  • Layout, structure design and foundations for the soil
  • Supply, installation, testing and commissioning
  • Evacuation line, metering and connection approvals
  • Fencing, cleaning water and maintenance planning

More detail: Ground-Mounted Solar Plant across India.

Questions about solar projects in Gujarat

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gujarat

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.