Output and land for a ground-mounted plant in Gujarat
Solar output changes across Gujarat with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,400 to 1,580 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ahmedabad | 1,410 | 1,470 |
| Amreli | 1,410 | 1,460 |
| Anand | 1,400 | 1,460 |
| Anjar | 1,470 | 1,530 |
| Anklav | 1,390 | 1,450 |
| Ankleshwar | 1,410 | 1,460 |
| Babra | 1,410 | 1,460 |
| Bagasra | 1,430 | 1,490 |
| Bardoli | 1,380 | 1,420 |
| Bhachau | 1,470 | 1,530 |
| Bhanvad | 1,440 | 1,490 |
| Bharuch | 1,410 | 1,460 |
| Bhavnagar | 1,420 | 1,480 |
| Bholav | 1,380 | 1,430 |
| Bhuj | 1,510 | 1,570 |
| Bilimora | 1,420 | 1,460 |
| Borsad | 1,410 | 1,460 |
| Botad | 1,410 | 1,470 |
| Chaklasi | 1,400 | 1,460 |
| Chhaya | 1,460 | 1,510 |
| Chhota Udepur | 1,390 | 1,440 |
| Chorwad | 1,480 | 1,520 |
| Dabhoi | 1,380 | 1,430 |
| Dahegam | 1,410 | 1,470 |
| Dakor | 1,390 | 1,450 |
| Deesa | 1,430 | 1,490 |
| Devgadh Bariya | 1,390 | 1,440 |
| Dhanera | 1,440 | 1,510 |
| Dharampur | 1,360 | 1,400 |
| Dhari | 1,440 | 1,490 |
| Dhoraji | 1,410 | 1,460 |
| Dhrol | 1,440 | 1,500 |
| Dohad | 1,380 | 1,440 |
| Dwarka | 1,520 | 1,570 |
| Gadhada | 1,410 | 1,460 |
| Gadkhol | 1,380 | 1,430 |
| Gandhidham | 1,470 | 1,530 |
| Gariadhar | 1,410 | 1,460 |
| Godhra | 1,390 | 1,450 |
| Gondal | 1,410 | 1,460 |
| Halol | 1,390 | 1,440 |
| Halvad | 1,440 | 1,500 |
| Harij | 1,430 | 1,490 |
| Himatnagar | 1,410 | 1,480 |
| Idar | 1,410 | 1,480 |
| Jafarabad | 1,490 | 1,540 |
| Jambusar | 1,410 | 1,460 |
| Jamjodhpur | 1,420 | 1,470 |
| Jamnagar | 1,440 | 1,500 |
| Jasdan | 1,420 | 1,480 |
| Jetpur | 1,410 | 1,460 |
| Jhadeshwar | 1,380 | 1,430 |
| Jhalod | 1,380 | 1,440 |
| Junagadh | 1,410 | 1,460 |
| Kadi | 1,420 | 1,480 |
| Kalavad | 1,410 | 1,470 |
| Kalol | 1,420 | 1,480 |
| Kapadvanj | 1,400 | 1,460 |
| Karjan | 1,390 | 1,440 |
| Kathlal | 1,400 | 1,460 |
| Keshod | 1,450 | 1,500 |
| Khambhaliya | 1,450 | 1,510 |
| Khambhat | 1,410 | 1,470 |
| Kheda | 1,410 | 1,460 |
| Khedbrahma | 1,410 | 1,480 |
| Kheralu | 1,420 | 1,480 |
| Kodinar | 1,490 | 1,540 |
| Kotharia | 1,420 | 1,480 |
| Lathi | 1,410 | 1,470 |
| Lunavada | 1,400 | 1,460 |
| Madhapar | 1,510 | 1,570 |
| Mahemdavad | 1,400 | 1,460 |
| Mahesana | 1,420 | 1,480 |
| Mahuva | 1,470 | 1,520 |
| Manavadar | 1,450 | 1,500 |
| Mandvi | 1,520 | 1,580 |
| Mangrol | 1,480 | 1,520 |
| Mansa | 1,410 | 1,480 |
| Modasa | 1,410 | 1,470 |
| Morvi | 1,440 | 1,500 |
| Nadiad | 1,400 | 1,460 |
| Navsari | 1,410 | 1,460 |
| Okha | 1,510 | 1,570 |
| Padra | 1,390 | 1,440 |
| Palanpur | 1,420 | 1,490 |
| Palitana | 1,410 | 1,460 |
| Pardi | 1,390 | 1,440 |
| Patan | 1,420 | 1,490 |
| Petlad | 1,410 | 1,460 |
| Porbandar | 1,460 | 1,510 |
| Prantij | 1,410 | 1,470 |
| Radhanpur | 1,440 | 1,500 |
| Rajkot | 1,430 | 1,480 |
| Rajpipla | 1,370 | 1,420 |
| Rajula | 1,460 | 1,510 |
| Ranavav | 1,460 | 1,510 |
| Rapar | 1,470 | 1,540 |
| Salaya | 1,460 | 1,510 |
| Savarkundla | 1,430 | 1,480 |
| Siddhapur | 1,420 | 1,490 |
| Sihor | 1,410 | 1,460 |
| Sikka | 1,440 | 1,500 |
| Songadh | 1,360 | 1,410 |
| Surat | 1,420 | 1,460 |
| Sutrapara | 1,500 | 1,550 |
| Talaja | 1,440 | 1,490 |
| Talala | 1,470 | 1,510 |
| Umargam | 1,370 | 1,410 |
| Umreth | 1,400 | 1,450 |
| Una | 1,480 | 1,530 |
| Unjha | 1,420 | 1,480 |
| Upleta | 1,410 | 1,470 |
| Vadali | 1,410 | 1,480 |
| Vadnagar | 1,410 | 1,480 |
| Vadodara | 1,390 | 1,440 |
| Vallabh Vidyanagar | 1,400 | 1,460 |
| Valsad | 1,400 | 1,440 |
| Vapi | 1,370 | 1,420 |
| Veraval | 1,490 | 1,530 |
| Vijalpor | 1,410 | 1,460 |
| Vijapur | 1,410 | 1,480 |
| Visnagar | 1,410 | 1,480 |
| Vyara | 1,350 | 1,400 |
| Wankaner | 1,440 | 1,490 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Gujarat
The Gujarat Integrated Renewable Energy Policy - 2025 is the state's current policy for solar, wind, hybrid and battery storage projects. The Government of Gujarat issued it on 24 December 2025. GERC's distributed renewable energy regulations of October 2026 list it among the rules a rooftop or distributed project must follow.
- Target: more than 100 GW of renewable capacity by 2030, more than 150 GW by 2035 and 300 GW by 2047.
- GERC records that the policy names GUVNL, the state holding company of the four distribution companies, as the agency that implements, coordinates and monitors it. Rooftop and other distributed projects register with GEDA under GERC's regulations.
- For commercial and industrial consumers the policy allows group net metering and virtual net metering for rooftop solar, gives a longer commissioning period for captive and third-party projects, and lets consumers who are not obligated entities claim the renewable attributes.
- Projects sanctioned under the earlier Renewable Energy Policy 2023 may finish within their agreement timeline or 6 months, whichever is later.
Under GERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or several in the same electricity division, can buy renewable power through open access. A captive consumer has no minimum load.
- There is no limit on the size of a captive renewable plant compared with the consumer's contract demand.
- Banking is settled within each billing cycle and cannot be carried forward. The banking charge is ₹1.00 per unit from 1 September 2026 to 31 March 2027. After that GERC sets it each year by a formula, between ₹0.50 and ₹1.50 per unit.
- For 2026-27 the cross-subsidy surcharge for HT consumers of the four state companies is ₹1.33 per unit. The additional surcharge is ₹0.99 per unit from 1 October 2026 to 31 March 2027 (it was ₹0.76 from April to September 2026). Neither applies to a captive plant.
- The wheeling charge on the state companies' HT network (11 kV to 33 kV) is 23.52 paise per unit for 2026-27.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Gujarat
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gujarat
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, gazetted 21 February 2024, with amendments to 19 August 2026; GERC tariff order for DGVCL for 2026-27 dated 25 March 2026 (chapter 9); GERC Orders No. 02 of 2026 (17 March 2026) and No. 05 of 2026 (10 September 2026) on additional surcharge
- MNRE, Policy & Regulatory Updates, December 2025 (section VI, Gujarat); GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 and their Statement of Reasons, 30 October 2026
- PVGIS, European Commission Joint Research Centre (solar output model)