Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Modasa, Gujarat.

Modasa at a glance for solar projects

District and stateArvalli district, Gujarat
Electricity supplyUttar Gujarat Vij Company Limited (UGVCL) supplies electricity in Arvalli district, one of the districts it lists as its area.
Electricity regulatorGujarat Electricity Regulatory Commission (GERC)
State renewable energy agencyGujarat Energy Development Agency (GEDA)
State solar policyGujarat Integrated Renewable Energy Policy - 2025 (issued 24 December 2025)
Rooftop metering for businessesNet metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC)
Modelled solar outputabout 1,410 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 710 km from Modasa in a straight line

Solar services in Modasa

Local points for solar projects in Modasa

The Government of India's One District One Product (ODOP) list names Agro Processing as the product of Arvalli district.

Solar output in Modasa

A solar plant in Modasa is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HTP-I (HT supply, contract demand 100 kVA and above), billing demand above 500 kVA and up to 2,500 kVA energy charge of ₹4.20 per kWh (GERC tariff orders for DGVCL, MGVCL, PGVCL and UGVCL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule applies to all four state companies. The energy charge is ₹4.00 per kWh up to 500 kVA of billing demand and ₹4.30 above 2,500 kVA. A demand charge also applies each month: ₹150 per kVA for the first 500 kVA, ₹260 for the next 500 kVA and ₹475 above 1,000 kVA, on the higher of actual maximum demand, 85% of contract demand or 100 kVA. Energy used from 7 to 11 AM and 6 to 10 PM costs 45 paise per kWh more (85 paise above 500 kVA), and energy used from 11 AM to 5 PM gets 60 paise per kWh off. A fuel and power purchase adjustment surcharge (FPPAS) is added by a GERC formula, and electricity duty and taxes are extra. Torrent Power has its own schedules: HTMD-1 in Ahmedabad and Gandhinagar is 455 paise per kWh for the first 400 units per kW of billing demand and 445 paise after that; HTMD-I in Surat is 480 and 470 paise; HTP-I in Dahej SEZ and Dholera SIR is 290 to 320 paise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.20 per kWh
100 kW1.4 lakh units1,000 sq m₹5.9 lakh
500 kW7.0 lakh units5,000 sq m₹29.6 lakh
1 MW14.1 lakh units10,000 sq m₹59.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Modasa

For a rooftop array in Modasa the strongest month is May, at about 149 units for each kW installed, and the weakest is August, at about 74. For a ground-mounted array at a 29° tilt the strongest month is March (about 151) and the weakest is July (about 69). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January125150
February125141
March145151
April146140
May149133
June114101
July7669
August7471
September9797
October126138
November115136
December116143

Somaya Solar projects near Modasa

These are the Somaya Solar projects closest to Modasa, with straight-line distances. They are shown as references and are not in Modasa unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 720 km from Modasa. Completed, including the transmission line work coordinated with the local distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 790 km from Modasa. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 820 km from Modasa. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.

See all published projects

Questions about solar projects in Modasa

Which electricity company handles solar connections in Modasa?

Uttar Gujarat Vij Company Limited (UGVCL) supplies electricity in Arvalli district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Modasa?

Net metering or net billing up to 1,000 kW (AC); gross and virtual net metering up to 4,000 kW (AC). The rule is the same across Gujarat.

How much electricity does a solar plant generate in Modasa?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Modasa?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 710 km from Modasa in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 720 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Modasa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image