Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Gujarat. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Metering rules for business rooftops in Gujarat
Since 30 October 2026, new rooftop and other distributed renewable systems in Gujarat come under GERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2026. They replace the Net Metering Rooftop Solar PV Regulations, 2016, last amended by the fifth amendment of 3 November 2025. Every consumer category may choose net metering, net billing, gross metering, group net metering or virtual net metering. Systems installed under the 2016 regulations stay under those rules and their agreements.
- Net metering and net billing: from 1 kW to 1,000 kW (AC), or 1,250 kWp (DC). Group net metering: 6 kW to 1,000 kW (AC).
- Gross metering: 6 kW to 4,000 kW (AC). Virtual net metering: 10 kW to 4,000 kW (AC), for consumers of the same distribution licensee in the same tariff category. The plant may be away from their premises.
- A consumer with a contract demand above 100 kW may install more than the contract demand only with a battery that covers at least 50% of the extra capacity for at least 2 hours a day.
- For commercial and industrial consumers, exported energy is set off only up to 30% of the energy drawn from the licensee in the same billing cycle, after a banking charge. Anything above that lapses. GERC's banking charge is ₹1.00 per unit from 1 September 2026 to 31 March 2027.
- Under net billing and gross metering, exported energy is paid at GERC's generic tariff for that source in the year the system is commissioned, fixed for the life of the system.
- Under group and virtual net metering, energy is wheeled to the participating connections. Wheeling charges, losses and banking charges apply, and also cross-subsidy and additional surcharges unless the plant qualifies as captive.
Output and bill value for a rooftop plant in Gujarat
Solar output changes across Gujarat with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,350 to 1,520 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ahmedabad | 1,410 | 1,470 |
| Amreli | 1,410 | 1,460 |
| Anand | 1,400 | 1,460 |
| Anjar | 1,470 | 1,530 |
| Anklav | 1,390 | 1,450 |
| Ankleshwar | 1,410 | 1,460 |
| Babra | 1,410 | 1,460 |
| Bagasra | 1,430 | 1,490 |
| Bardoli | 1,380 | 1,420 |
| Bhachau | 1,470 | 1,530 |
| Bhanvad | 1,440 | 1,490 |
| Bharuch | 1,410 | 1,460 |
| Bhavnagar | 1,420 | 1,480 |
| Bholav | 1,380 | 1,430 |
| Bhuj | 1,510 | 1,570 |
| Bilimora | 1,420 | 1,460 |
| Borsad | 1,410 | 1,460 |
| Botad | 1,410 | 1,470 |
| Chaklasi | 1,400 | 1,460 |
| Chhaya | 1,460 | 1,510 |
| Chhota Udepur | 1,390 | 1,440 |
| Chorwad | 1,480 | 1,520 |
| Dabhoi | 1,380 | 1,430 |
| Dahegam | 1,410 | 1,470 |
| Dakor | 1,390 | 1,450 |
| Deesa | 1,430 | 1,490 |
| Devgadh Bariya | 1,390 | 1,440 |
| Dhanera | 1,440 | 1,510 |
| Dharampur | 1,360 | 1,400 |
| Dhari | 1,440 | 1,490 |
| Dhoraji | 1,410 | 1,460 |
| Dhrol | 1,440 | 1,500 |
| Dohad | 1,380 | 1,440 |
| Dwarka | 1,520 | 1,570 |
| Gadhada | 1,410 | 1,460 |
| Gadkhol | 1,380 | 1,430 |
| Gandhidham | 1,470 | 1,530 |
| Gariadhar | 1,410 | 1,460 |
| Godhra | 1,390 | 1,450 |
| Gondal | 1,410 | 1,460 |
| Halol | 1,390 | 1,440 |
| Halvad | 1,440 | 1,500 |
| Harij | 1,430 | 1,490 |
| Himatnagar | 1,410 | 1,480 |
| Idar | 1,410 | 1,480 |
| Jafarabad | 1,490 | 1,540 |
| Jambusar | 1,410 | 1,460 |
| Jamjodhpur | 1,420 | 1,470 |
| Jamnagar | 1,440 | 1,500 |
| Jasdan | 1,420 | 1,480 |
| Jetpur | 1,410 | 1,460 |
| Jhadeshwar | 1,380 | 1,430 |
| Jhalod | 1,380 | 1,440 |
| Junagadh | 1,410 | 1,460 |
| Kadi | 1,420 | 1,480 |
| Kalavad | 1,410 | 1,470 |
| Kalol | 1,420 | 1,480 |
| Kapadvanj | 1,400 | 1,460 |
| Karjan | 1,390 | 1,440 |
| Kathlal | 1,400 | 1,460 |
| Keshod | 1,450 | 1,500 |
| Khambhaliya | 1,450 | 1,510 |
| Khambhat | 1,410 | 1,470 |
| Kheda | 1,410 | 1,460 |
| Khedbrahma | 1,410 | 1,480 |
| Kheralu | 1,420 | 1,480 |
| Kodinar | 1,490 | 1,540 |
| Kotharia | 1,420 | 1,480 |
| Lathi | 1,410 | 1,470 |
| Lunavada | 1,400 | 1,460 |
| Madhapar | 1,510 | 1,570 |
| Mahemdavad | 1,400 | 1,460 |
| Mahesana | 1,420 | 1,480 |
| Mahuva | 1,470 | 1,520 |
| Manavadar | 1,450 | 1,500 |
| Mandvi | 1,520 | 1,580 |
| Mangrol | 1,480 | 1,520 |
| Mansa | 1,410 | 1,480 |
| Modasa | 1,410 | 1,470 |
| Morvi | 1,440 | 1,500 |
| Nadiad | 1,400 | 1,460 |
| Navsari | 1,410 | 1,460 |
| Okha | 1,510 | 1,570 |
| Padra | 1,390 | 1,440 |
| Palanpur | 1,420 | 1,490 |
| Palitana | 1,410 | 1,460 |
| Pardi | 1,390 | 1,440 |
| Patan | 1,420 | 1,490 |
| Petlad | 1,410 | 1,460 |
| Porbandar | 1,460 | 1,510 |
| Prantij | 1,410 | 1,470 |
| Radhanpur | 1,440 | 1,500 |
| Rajkot | 1,430 | 1,480 |
| Rajpipla | 1,370 | 1,420 |
| Rajula | 1,460 | 1,510 |
| Ranavav | 1,460 | 1,510 |
| Rapar | 1,470 | 1,540 |
| Salaya | 1,460 | 1,510 |
| Savarkundla | 1,430 | 1,480 |
| Siddhapur | 1,420 | 1,490 |
| Sihor | 1,410 | 1,460 |
| Sikka | 1,440 | 1,500 |
| Songadh | 1,360 | 1,410 |
| Surat | 1,420 | 1,460 |
| Sutrapara | 1,500 | 1,550 |
| Talaja | 1,440 | 1,490 |
| Talala | 1,470 | 1,510 |
| Umargam | 1,370 | 1,410 |
| Umreth | 1,400 | 1,450 |
| Una | 1,480 | 1,530 |
| Unjha | 1,420 | 1,480 |
| Upleta | 1,410 | 1,470 |
| Vadali | 1,410 | 1,480 |
| Vadnagar | 1,410 | 1,480 |
| Vadodara | 1,390 | 1,440 |
| Vallabh Vidyanagar | 1,400 | 1,460 |
| Valsad | 1,400 | 1,440 |
| Vapi | 1,370 | 1,420 |
| Veraval | 1,490 | 1,530 |
| Vijalpor | 1,410 | 1,460 |
| Vijapur | 1,410 | 1,480 |
| Visnagar | 1,410 | 1,480 |
| Vyara | 1,350 | 1,400 |
| Wankaner | 1,440 | 1,490 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Questions about solar projects in Gujarat
Is net metering available for factories and commercial buildings in Gujarat?
Since 30 October 2026, new rooftop and other distributed renewable systems in Gujarat come under GERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2026. They replace the Net Metering Rooftop Solar PV Regulations, 2016, last amended by the fifth amendment of 3 November 2025. Every consumer category may choose net metering, net billing, gross metering, group net metering or virtual net metering. Systems installed under the 2016 regulations stay under those rules and their agreements.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gujarat
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 (Notification No. 11 of 2026, Gujarat Government Gazette of 30 October 2026) and Statement of Reasons; GERC Green Energy Open Access (Sixth Amendment) Regulations, 2026, notified 19 August 2026
- PVGIS, European Commission Joint Research Centre (solar output model)