Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Behror, Rajasthan.

Behror at a glance for solar projects

District and stateKotputli-Behror district, Rajasthan
Electricity supplyJaipur Vidyut Vitran Nigam Limited (JVVNL, the Jaipur Discom) supplies electricity here. Its Kotputli circle lists an operation and maintenance office at Behror.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,430 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 140 km from Behror in a straight line

Solar services in Behror

Behror: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists an industrial area at Behror under its Neemrana unit office, alongside EPIP Neemrana and Neemrana Phases I and II.

The Government of India's One District One Product (ODOP) list names Automobiles Parts as the product of Kotputli-Behror district.

Solar output in Behror

A solar plant in Behror is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.3 lakh
500 kW7.2 lakh units5,000 sq m₹46.5 lakh
1 MW14.3 lakh units10,000 sq m₹93.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Behror

For a rooftop array in Behror the strongest month is May, at about 146 units for each kW installed, and the weakest is August, at about 99. For a ground-mounted array at a 32° tilt the strongest month is March (about 148) and the weakest is July (about 93). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January111140
February116135
March139148
April144141
May146132
June126111
July10393
August9994
September108111
October123140
November108134
December108139

Somaya Solar projects near Behror

These are the Somaya Solar projects closest to Behror, with straight-line distances. They are shown as references and are not in Behror unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 240 km from Behror. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 290 km from Behror. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 290 km from Behror. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Behror

Which electricity company handles solar connections in Behror?

Jaipur Vidyut Vitran Nigam Limited (JVVNL, the Jaipur Discom) supplies electricity here. Its Kotputli circle lists an operation and maintenance office at Behror.

Is net metering available for factories and commercial buildings in Behror?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Behror?

About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Behror?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 140 km from Behror in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 240 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Behror

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.