Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Bikramganj, Bihar.
Bikramganj at a glance for solar projects
| District and state | Rohtas district, Bihar |
|---|---|
| Electricity supply | South Bihar Power Distribution Company Limited (SBPDCL) supplies electricity in Rohtas district, one of the districts it lists as its area. |
| Electricity regulator | Bihar Electricity Regulatory Commission (BERC) |
| State renewable energy agency | Bihar Renewable Energy Development Agency (BREDA) |
| State solar policy | Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 (issued 10 July 2025; in force for five years or until a new policy replaces it) |
| Rooftop metering for businesses | Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 780 km from Bikramganj in a straight line |
Solar services in Bikramganj
- Solar EPC Company in Bikramganj
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Bikramganj
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Bikramganj
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Bikramganj
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Bikramganj
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Bikramganj
One contract from survey to a working plant, with approvals and handover included.
Bikramganj: industrial areas
BIADA, the Bihar Industrial Area Development Authority, lists IA Bikramganj among its industrial areas in Rohtas district.
The Government of India's One District One Product (ODOP) list names Menthol, Sonachud Rice and Tomato as the products of Rohtas district.
Solar output in Bikramganj
A solar plant in Bikramganj is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTIS-I, 11 kV, contract demand 50 to 1,500 kVA) energy charge of ₹7.98 per kVAh (BERC tariff order for NBPDCL and SBPDCL, dated 18 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The same rate applies in both NBPDCL and SBPDCL areas. A demand charge of ₹550 per kVA per month also applies. It is charged on the maximum demand recorded or 75% of the contract demand, whichever is higher, and demand above 105% of the contract demand is billed at twice the normal charge. The energy charge is ₹7.92 per kVAh for HTIS-II (33 kV, 500 to 15,000 kVA), ₹7.85 at 132 kV, ₹7.79 at 220 kV and ₹7.72 at 400 kV. Induction furnace consumers (HTSS) pay ₹4.94 per kVAh and ₹800 per kVA per month. Time-of-day rates apply to consumers above 10 kW from 1 April 2026: 80% of the energy charge from 9 am to 5 pm and 120% from 5 pm to 11 pm. The tariff is set without any Government of Bihar subsidy. It stays in force until 31 March 2027 or the next tariff order.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.98 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.9 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹54.7 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹1.09 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Bikramganj
For a rooftop array in Bikramganj the strongest month is April, at about 142 units for each kW installed, and the weakest is July, at about 90. For a ground-mounted array at a 30° tilt the strongest month is March (about 149) and the weakest is July (about 82). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 113 | 138 |
| February | 118 | 134 |
| March | 141 | 149 |
| April | 142 | 138 |
| May | 141 | 128 |
| June | 112 | 100 |
| July | 90 | 82 |
| August | 92 | 87 |
| September | 96 | 97 |
| October | 112 | 123 |
| November | 109 | 130 |
| December | 108 | 135 |
Somaya Solar projects near Bikramganj
These are the Somaya Solar projects closest to Bikramganj, with straight-line distances. They are shown as references and are not in Bikramganj unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 420 km from Bikramganj. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 520 km from Bikramganj. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 690 km from Bikramganj. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Bikramganj
Which electricity company handles solar connections in Bikramganj?
South Bihar Power Distribution Company Limited (SBPDCL) supplies electricity in Rohtas district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Bikramganj?
Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending. The rule is the same across Bihar.
How much electricity does a solar plant generate in Bikramganj?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Bikramganj?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 780 km from Bikramganj in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 420 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bikramganj
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2018, consolidated text with the 1st Amendment of 24 July 2024 (BERC Compendium of Regulations Vol-II); BERC public notice No. 12 of 8 October 2026 with the draft Second Amendment
- BERC tariff order for NBPDCL and SBPDCL for 2026-27, dated 18 March 2026 (tariff schedule, Appendix 1), as published by NBPDCL; the same schedule is on the SBPDCL website
- BIADA website, Industrial Land > Available Land & Rates Details (Vacant Plot Details), by cluster and district
- Bihar Electricity Regulatory Commission
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 (Energy Department, Government of Bihar), section 5: BREDA is the State Nodal Agency
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025, Energy Department, Government of Bihar (scanned PDF); MNRE Policy & Regulatory Updates, July 2025, item V.1, gives the date 10 July 2025
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (Bihar rows)
- PVGIS, European Commission Joint Research Centre (solar output model)
- SBPDCL: fuse call centre list (district and division)