Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Bolpur, West Bengal. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Bolpur

The Government of India's One District One Product (ODOP) list names Santiniketan Leather goods and Kantha as the products of Birbhum district.

Metering rules for business rooftops in Bolpur

In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.

The size limits, charges and other conditions for West Bengal are on the page Commercial & Industrial Solar in West Bengal.

In Bolpur the application for connection and metering goes to WBSEDCL.

Output and bill value for a rooftop plant in Bolpur

A solar plant in Bolpur is modelled to produce about 1,300 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industries (11 kV), Rate E(B), high voltage energy charge of ₹7.07 per kWh (WBERC tariff order for WBSEDCL for 2025-26, dated 20 March 2025, in force from 1 April 2025 and continuing until further order). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is the summer rate; it is ₹7.06 per unit in monsoon and ₹7.05 in winter. At 33 kV the rates are ₹6.91, ₹6.89 and ₹6.87; at 132 kV ₹6.77, ₹6.75 and ₹6.73. A demand charge of ₹384 per kVA per month also applies. An optional time-of-day scheme at 11 kV charges ₹6.95 (6 AM to 5 PM), ₹8.37 (5 PM to 11 PM) and ₹5.18 (11 PM to 6 AM) in summer; at 220 kV only time-of-day rates apply. Electricity duty and taxes are extra. A green tariff of 50 paise per unit applies on top for consumers who ask for green power. Consumers in the former DPL area of Durgapur still pay DPL's tariff as on 31 December 2018. Other licensees have their own orders: CESC charges ₹6.81 per unit (summer) for HV industries below 33 kV and ₹6.58 at 33 kV (order of 25 March 2025), and DVC charges ₹6.21 at 11 kV (order of 31 March 2025), each with a demand charge of ₹384 per kVA per month. No WBERC tariff order for 2026-27 was listed on WBERC's website on 18 November 2026.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.07 per kWh
100 kW1.3 lakh units1,000 sq m₹9.2 lakh
250 kW3.2 lakh units2,500 sq m₹23.0 lakh
500 kW6.5 lakh units5,000 sq m₹46.0 lakh
1 MW13.0 lakh units10,000 sq m₹91.9 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Bolpur

These are the Somaya Solar projects closest to Bolpur, with straight-line distances. They are shown as references and are not in Bolpur unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 910 km from Bolpur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1070 km from Bolpur. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1180 km from Bolpur. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Bolpur

Which electricity company handles solar connections in Bolpur?

West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Birbhum district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Bolpur?

Net metering up to 500 kW; net billing and gross metering up to the contract demand. The rule is the same across West Bengal.

How much electricity does a solar plant generate in Bolpur?

About 1,300 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Bolpur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1160 km from Bolpur in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 910 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bolpur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image