Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in West Bengal.
West Bengal at a glance for solar projects
| Electricity regulator | West Bengal Electricity Regulatory Commission (WBERC) |
|---|---|
| State renewable energy agency | West Bengal Renewable Energy Development Agency (WBREDA) |
| Electricity distribution | WBSEDCL (Most of West Bengal, with more than 2.03 crore customers across the state. Since 1 January 2019 it also supplies the former Durgapur Projects Limited (DPL) area in Durgapur.); CESC (Kolkata and some areas in the districts of Howrah, Hooghly, North 24 Parganas and South 24 Parganas); IPCL (About 798 sq. km in the Asansol-Raniganj industrial belt); DVC (Retail supply to consumers in the part of the Damodar Valley area that lies in West Bengal) |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing and gross metering up to the contract demand |
Solar services in West Bengal
- Solar EPC Company in West Bengal
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in West Bengal
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in West Bengal
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in West Bengal
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in West Bengal
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in West Bengal
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in West Bengal
Solar output changes across West Bengal with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,010 to 1,350 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Adra | 1,330 | 1,380 |
| Alipur Duar | 1,150 | 1,220 |
| Asansol | 1,320 | 1,380 |
| Bagula | 1,280 | 1,330 |
| Baharampur | 1,280 | 1,340 |
| Balarampur | 1,330 | 1,380 |
| Balurghat | 1,230 | 1,300 |
| Bankura | 1,320 | 1,370 |
| Baranagar | 1,270 | 1,320 |
| Barddhaman | 1,300 | 1,350 |
| Beldanga | 1,280 | 1,340 |
| Bhadreswar | 1,270 | 1,320 |
| Bishnupur | 1,310 | 1,360 |
| Bolpur | 1,300 | 1,350 |
| Budge Budge | 1,280 | 1,330 |
| Chandrakona | 1,290 | 1,340 |
| Contai | 1,350 | 1,390 |
| Cooper's Camp | 1,280 | 1,330 |
| Dam Dam | 1,270 | 1,320 |
| Darjeeling | 1,010 | 1,050 |
| Dhulian | 1,280 | 1,350 |
| Dhupgari | 1,110 | 1,180 |
| Dinhata | 1,170 | 1,240 |
| Dubrajpur | 1,300 | 1,360 |
| Durgapur | 1,310 | 1,360 |
| Egra | 1,340 | 1,380 |
| Falakata | 1,110 | 1,180 |
| Gangarampur | 1,220 | 1,290 |
| Ghatal | 1,290 | 1,340 |
| Guskhara | 1,300 | 1,360 |
| Haldia | 1,290 | 1,340 |
| Howrah | 1,270 | 1,320 |
| Islampur | 1,200 | 1,280 |
| Jalpaiguri | 1,130 | 1,200 |
| Jangipur | 1,290 | 1,350 |
| Jhargram | 1,300 | 1,350 |
| Kalimpong | 1,090 | 1,150 |
| Kaliyaganj | 1,220 | 1,290 |
| Kalna | 1,280 | 1,330 |
| Kalyani | 1,280 | 1,330 |
| Kamarhati | 1,270 | 1,320 |
| Kandi | 1,290 | 1,340 |
| Katoya | 1,290 | 1,340 |
| Kharagpur | 1,300 | 1,340 |
| Koch Bihar | 1,150 | 1,220 |
| Kolkata | 1,270 | 1,320 |
| Krishnanagar | 1,280 | 1,340 |
| Kurseong | 1,090 | 1,150 |
| Maheshtala | 1,270 | 1,320 |
| Mainaguri | 1,120 | 1,190 |
| Malda | 1,260 | 1,330 |
| Matabhanga | 1,150 | 1,220 |
| Medinipur | 1,300 | 1,340 |
| Memari | 1,290 | 1,340 |
| Murshidabad | 1,280 | 1,340 |
| Nalhati | 1,280 | 1,340 |
| Navadwip | 1,280 | 1,330 |
| Puruliya | 1,340 | 1,390 |
| Raghunathpur | 1,330 | 1,380 |
| Raiganj | 1,230 | 1,300 |
| Rampur Hat | 1,290 | 1,340 |
| Ranaghat | 1,280 | 1,330 |
| Sainthia | 1,300 | 1,350 |
| Sankrail | 1,280 | 1,320 |
| Shantipur | 1,280 | 1,330 |
| Siliguri | 1,150 | 1,220 |
| Siuri | 1,300 | 1,350 |
| Sonamukhi | 1,310 | 1,360 |
| Tamluk | 1,280 | 1,330 |
| Titagarh | 1,270 | 1,320 |
| Tufanganj | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in West Bengal
- Adra
- Alipur Duar
- Asansol
- Bagula
- Baharampur
- Balarampur
- Balurghat
- Bankura
- Baranagar
- Barddhaman
- Beldanga
- Bhadreswar
- Bishnupur
- Bolpur
- Budge Budge
- Chandrakona
- Contai
- Cooper's Camp
- Dam Dam
- Darjeeling
- Dhulian
- Dhupgari
- Dinhata
- Dubrajpur
- Durgapur
- Egra
- Falakata
- Gangarampur
- Ghatal
- Guskhara
- Haldia
- Howrah
- Islampur
- Jalpaiguri
- Jangipur
- Jhargram
- Kalimpong
- Kaliyaganj
- Kalna
- Kalyani
- Kamarhati
- Kandi
- Katoya
- Kharagpur
- Koch Bihar
- Kolkata
- Krishnanagar
- Kurseong
- Maheshtala
- Mainaguri
- Malda
- Matabhanga
- Medinipur
- Memari
- Murshidabad
- Nalhati
- Navadwip
- Puruliya
- Raghunathpur
- Raiganj
- Rampur Hat
- Ranaghat
- Sainthia
- Sankrail
- Shantipur
- Siliguri
- Siuri
- Sonamukhi
- Tamluk
- Titagarh
- Tufanganj
Questions about solar projects in West Bengal
Is net metering available for factories and commercial buildings in West Bengal?
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in West Bengal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- WBERC (Grid Interactive Rooftop Solar Photovoltaic System for Prosumers) Regulations, 2025, Notification No. 81/WBERC, Kolkata Gazette of 31 July 2025; WBERC suo-motu order SM-40/25-26 of 20 August 2025 (feed-in tariff)
- WBERC tariff orders for 2025-26: WBSEDCL (20 March 2025, chapter 3), CESC (25 March 2025, paragraph 1.2), IPCL (21 January 2025, paragraphs 2.2 and 5.1), DVC (31 March 2025, paragraph 1.2) and DPL (5 March 2025, paragraph 1.2: DPL's distribution business moved to WBSEDCL from 1 January 2019); WBSEDCL company profile (wbsedcl.in)
- West Bengal Electricity Regulatory Commission
- West Bengal Renewable Energy Development Agency, home page (describes WBREDA as the State Nodal Agency for non-conventional energy programmes)