Somaya Solar Solutions Limited delivers turnkey solar projects in West Bengal: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in West Bengal
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in West Bengal
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
- The total rooftop capacity on a feeder or distribution transformer may not exceed 100% of its capacity.
- An HT consumer may connect the plant at its LT bus bar, but the net meter must be on the HT side of the consumer's transformer.
- Each licensee must allow net metering at least up to a yearly quota. For WBSEDCL it is 100 MW in 2025-26 and 195 MW in 2026-27; for CESC 25 MW and 50 MW; for DVC 25 MW and 50 MW; for IPCL 5 MW in each year. Applications are taken first come, first served.
- Under net metering, surplus units carry forward from bill to bill and lapse at the end of the settlement period, which runs from 1 April to 31 March. A consumer on time-of-day tariff has generation set off against consumption in the same time block.
- Under net billing and gross metering, exported or generated energy is paid at a feed-in tariff set by WBERC. For 2025-26 WBERC set WBSEDCL's feed-in tariff at ₹3.89 per unit at HV, ₹3.73 at EHV and ₹4.37 at LT and MV. The rate agreed in the agreement holds for the life of the plant.
- Under net billing any credit left at the end of the financial year is reset to zero. Under gross metering the licensee pays out the credit at the end of the settlement period.
- The application fee is ₹5,000 for HV and EHV consumers. Above 10 kW the licensee must finish a technical feasibility study within 15 days, or the proposal is treated as feasible, and the consumer pays any network upgrade cost.
- The regulations do not provide for group or virtual net metering.
What to expect from the plant in West Bengal
Solar output changes across West Bengal with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,010 to 1,350 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Adra | 1,330 | 1,380 |
| Alipur Duar | 1,150 | 1,220 |
| Asansol | 1,320 | 1,380 |
| Bagula | 1,280 | 1,330 |
| Baharampur | 1,280 | 1,340 |
| Balarampur | 1,330 | 1,380 |
| Balurghat | 1,230 | 1,300 |
| Bankura | 1,320 | 1,370 |
| Baranagar | 1,270 | 1,320 |
| Barddhaman | 1,300 | 1,350 |
| Beldanga | 1,280 | 1,340 |
| Bhadreswar | 1,270 | 1,320 |
| Bishnupur | 1,310 | 1,360 |
| Bolpur | 1,300 | 1,350 |
| Budge Budge | 1,280 | 1,330 |
| Chandrakona | 1,290 | 1,340 |
| Contai | 1,350 | 1,390 |
| Cooper's Camp | 1,280 | 1,330 |
| Dam Dam | 1,270 | 1,320 |
| Darjeeling | 1,010 | 1,050 |
| Dhulian | 1,280 | 1,350 |
| Dhupgari | 1,110 | 1,180 |
| Dinhata | 1,170 | 1,240 |
| Dubrajpur | 1,300 | 1,360 |
| Durgapur | 1,310 | 1,360 |
| Egra | 1,340 | 1,380 |
| Falakata | 1,110 | 1,180 |
| Gangarampur | 1,220 | 1,290 |
| Ghatal | 1,290 | 1,340 |
| Guskhara | 1,300 | 1,360 |
| Haldia | 1,290 | 1,340 |
| Howrah | 1,270 | 1,320 |
| Islampur | 1,200 | 1,280 |
| Jalpaiguri | 1,130 | 1,200 |
| Jangipur | 1,290 | 1,350 |
| Jhargram | 1,300 | 1,350 |
| Kalimpong | 1,090 | 1,150 |
| Kaliyaganj | 1,220 | 1,290 |
| Kalna | 1,280 | 1,330 |
| Kalyani | 1,280 | 1,330 |
| Kamarhati | 1,270 | 1,320 |
| Kandi | 1,290 | 1,340 |
| Katoya | 1,290 | 1,340 |
| Kharagpur | 1,300 | 1,340 |
| Koch Bihar | 1,150 | 1,220 |
| Kolkata | 1,270 | 1,320 |
| Krishnanagar | 1,280 | 1,340 |
| Kurseong | 1,090 | 1,150 |
| Maheshtala | 1,270 | 1,320 |
| Mainaguri | 1,120 | 1,190 |
| Malda | 1,260 | 1,330 |
| Matabhanga | 1,150 | 1,220 |
| Medinipur | 1,300 | 1,340 |
| Memari | 1,290 | 1,340 |
| Murshidabad | 1,280 | 1,340 |
| Nalhati | 1,280 | 1,340 |
| Navadwip | 1,280 | 1,330 |
| Puruliya | 1,340 | 1,390 |
| Raghunathpur | 1,330 | 1,380 |
| Raiganj | 1,230 | 1,300 |
| Rampur Hat | 1,290 | 1,340 |
| Ranaghat | 1,280 | 1,330 |
| Sainthia | 1,300 | 1,350 |
| Sankrail | 1,280 | 1,320 |
| Shantipur | 1,280 | 1,330 |
| Siliguri | 1,150 | 1,220 |
| Siuri | 1,300 | 1,350 |
| Sonamukhi | 1,310 | 1,360 |
| Tamluk | 1,280 | 1,330 |
| Titagarh | 1,270 | 1,320 |
| Tufanganj | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in West Bengal
Is net metering available for factories and commercial buildings in West Bengal?
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in West Bengal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.