Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Mainaguri, West Bengal.

Mainaguri at a glance for solar projects

District and stateJalpaiguri district, West Bengal
Electricity supplyWest Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Jalpaiguri district, one of the districts it lists as its area.
Electricity regulatorWest Bengal Electricity Regulatory Commission (WBERC)
State renewable energy agencyWest Bengal Renewable Energy Development Agency (WBREDA)
Rooftop metering for businessesNet metering up to 500 kW; net billing and gross metering up to the contract demand
Modelled solar outputabout 1,120 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1140 km from Mainaguri in a straight line

Solar services in Mainaguri

Local points for solar projects in Mainaguri

The Government of India's One District One Product (ODOP) list names Tea, Cane Furniture and Wood Carving as the products of Jalpaiguri district.

Solar output in Mainaguri

A solar plant in Mainaguri is modelled to produce about 1,120 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industries (11 kV), Rate E(B), high voltage energy charge of ₹7.07 per kWh (WBERC tariff order for WBSEDCL for 2025-26, dated 20 March 2025, in force from 1 April 2025 and continuing until further order). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is the summer rate; it is ₹7.06 per unit in monsoon and ₹7.05 in winter. At 33 kV the rates are ₹6.91, ₹6.89 and ₹6.87; at 132 kV ₹6.77, ₹6.75 and ₹6.73. A demand charge of ₹384 per kVA per month also applies. An optional time-of-day scheme at 11 kV charges ₹6.95 (6 AM to 5 PM), ₹8.37 (5 PM to 11 PM) and ₹5.18 (11 PM to 6 AM) in summer; at 220 kV only time-of-day rates apply. Electricity duty and taxes are extra. A green tariff of 50 paise per unit applies on top for consumers who ask for green power. Consumers in the former DPL area of Durgapur still pay DPL's tariff as on 31 December 2018. Other licensees have their own orders: CESC charges ₹6.81 per unit (summer) for HV industries below 33 kV and ₹6.58 at 33 kV (order of 25 March 2025), and DVC charges ₹6.21 at 11 kV (order of 31 March 2025), each with a demand charge of ₹384 per kVA per month. No WBERC tariff order for 2026-27 was listed on WBERC's website on 18 November 2026.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.07 per kWh
100 kW1.1 lakh units1,000 sq m₹7.9 lakh
500 kW5.6 lakh units5,000 sq m₹39.6 lakh
1 MW11.2 lakh units10,000 sq m₹79.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Mainaguri

For a rooftop array in Mainaguri the strongest month is March, at about 121 units for each kW installed, and the weakest is July, at about 69. For a ground-mounted array at a 33° tilt the strongest month is March (about 128) and the weakest is July (about 62). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January98122
February98114
March121128
April114110
May10494
June7566
July6962
August7570
September7878
October99110
November97118
December93119

Somaya Solar projects near Mainaguri

These are the Somaya Solar projects closest to Mainaguri, with straight-line distances. They are shown as references and are not in Mainaguri unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 890 km from Mainaguri. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 900 km from Mainaguri. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1010 km from Mainaguri. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Mainaguri

Which electricity company handles solar connections in Mainaguri?

West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Jalpaiguri district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Mainaguri?

Net metering up to 500 kW; net billing and gross metering up to the contract demand. The rule is the same across West Bengal.

How much electricity does a solar plant generate in Mainaguri?

About 1,120 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mainaguri?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1140 km from Mainaguri in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 890 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mainaguri

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image