Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in West Bengal. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
West Bengal at a glance for solar projects
| Electricity regulator | West Bengal Electricity Regulatory Commission (WBERC) |
|---|---|
| State renewable energy agency | West Bengal Renewable Energy Development Agency (WBREDA) |
| Electricity distribution | WBSEDCL (Most of West Bengal, with more than 2.03 crore customers across the state. Since 1 January 2019 it also supplies the former Durgapur Projects Limited (DPL) area in Durgapur.); CESC (Kolkata and some areas in the districts of Howrah, Hooghly, North 24 Parganas and South 24 Parganas); IPCL (About 798 sq. km in the Asansol-Raniganj industrial belt); DVC (Retail supply to consumers in the part of the Damodar Valley area that lies in West Bengal) |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing and gross metering up to the contract demand |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in West Bengal
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
- The total rooftop capacity on a feeder or distribution transformer may not exceed 100% of its capacity.
- An HT consumer may connect the plant at its LT bus bar, but the net meter must be on the HT side of the consumer's transformer.
- Each licensee must allow net metering at least up to a yearly quota. For WBSEDCL it is 100 MW in 2025-26 and 195 MW in 2026-27; for CESC 25 MW and 50 MW; for DVC 25 MW and 50 MW; for IPCL 5 MW in each year. Applications are taken first come, first served.
- Under net metering, surplus units carry forward from bill to bill and lapse at the end of the settlement period, which runs from 1 April to 31 March. A consumer on time-of-day tariff has generation set off against consumption in the same time block.
- Under net billing and gross metering, exported or generated energy is paid at a feed-in tariff set by WBERC. For 2025-26 WBERC set WBSEDCL's feed-in tariff at ₹3.89 per unit at HV, ₹3.73 at EHV and ₹4.37 at LT and MV. The rate agreed in the agreement holds for the life of the plant.
- Under net billing any credit left at the end of the financial year is reset to zero. Under gross metering the licensee pays out the credit at the end of the settlement period.
- The application fee is ₹5,000 for HV and EHV consumers. Above 10 kW the licensee must finish a technical feasibility study within 15 days, or the proposal is treated as feasible, and the consumer pays any network upgrade cost.
- The regulations do not provide for group or virtual net metering.
What a plant produces in West Bengal
Solar output changes across West Bengal with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,010 to 1,350 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Adra | 1,330 | 1,380 |
| Alipur Duar | 1,150 | 1,220 |
| Asansol | 1,320 | 1,380 |
| Bagula | 1,280 | 1,330 |
| Baharampur | 1,280 | 1,340 |
| Balarampur | 1,330 | 1,380 |
| Balurghat | 1,230 | 1,300 |
| Bankura | 1,320 | 1,370 |
| Baranagar | 1,270 | 1,320 |
| Barddhaman | 1,300 | 1,350 |
| Beldanga | 1,280 | 1,340 |
| Bhadreswar | 1,270 | 1,320 |
| Bishnupur | 1,310 | 1,360 |
| Bolpur | 1,300 | 1,350 |
| Budge Budge | 1,280 | 1,330 |
| Chandrakona | 1,290 | 1,340 |
| Contai | 1,350 | 1,390 |
| Cooper's Camp | 1,280 | 1,330 |
| Dam Dam | 1,270 | 1,320 |
| Darjeeling | 1,010 | 1,050 |
| Dhulian | 1,280 | 1,350 |
| Dhupgari | 1,110 | 1,180 |
| Dinhata | 1,170 | 1,240 |
| Dubrajpur | 1,300 | 1,360 |
| Durgapur | 1,310 | 1,360 |
| Egra | 1,340 | 1,380 |
| Falakata | 1,110 | 1,180 |
| Gangarampur | 1,220 | 1,290 |
| Ghatal | 1,290 | 1,340 |
| Guskhara | 1,300 | 1,360 |
| Haldia | 1,290 | 1,340 |
| Howrah | 1,270 | 1,320 |
| Islampur | 1,200 | 1,280 |
| Jalpaiguri | 1,130 | 1,200 |
| Jangipur | 1,290 | 1,350 |
| Jhargram | 1,300 | 1,350 |
| Kalimpong | 1,090 | 1,150 |
| Kaliyaganj | 1,220 | 1,290 |
| Kalna | 1,280 | 1,330 |
| Kalyani | 1,280 | 1,330 |
| Kamarhati | 1,270 | 1,320 |
| Kandi | 1,290 | 1,340 |
| Katoya | 1,290 | 1,340 |
| Kharagpur | 1,300 | 1,340 |
| Koch Bihar | 1,150 | 1,220 |
| Kolkata | 1,270 | 1,320 |
| Krishnanagar | 1,280 | 1,340 |
| Kurseong | 1,090 | 1,150 |
| Maheshtala | 1,270 | 1,320 |
| Mainaguri | 1,120 | 1,190 |
| Malda | 1,260 | 1,330 |
| Matabhanga | 1,150 | 1,220 |
| Medinipur | 1,300 | 1,340 |
| Memari | 1,290 | 1,340 |
| Murshidabad | 1,280 | 1,340 |
| Nalhati | 1,280 | 1,340 |
| Navadwip | 1,280 | 1,330 |
| Puruliya | 1,340 | 1,390 |
| Raghunathpur | 1,330 | 1,380 |
| Raiganj | 1,230 | 1,300 |
| Rampur Hat | 1,290 | 1,340 |
| Ranaghat | 1,280 | 1,330 |
| Sainthia | 1,300 | 1,350 |
| Sankrail | 1,280 | 1,320 |
| Shantipur | 1,280 | 1,330 |
| Siliguri | 1,150 | 1,220 |
| Siuri | 1,300 | 1,350 |
| Sonamukhi | 1,310 | 1,360 |
| Tamluk | 1,280 | 1,330 |
| Titagarh | 1,270 | 1,320 |
| Tufanganj | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in West Bengal
Is net metering available for factories and commercial buildings in West Bengal?
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in West Bengal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- WBERC (Grid Interactive Rooftop Solar Photovoltaic System for Prosumers) Regulations, 2025, Notification No. 81/WBERC, Kolkata Gazette of 31 July 2025; WBERC suo-motu order SM-40/25-26 of 20 August 2025 (feed-in tariff)
- WBERC tariff orders for 2025-26: WBSEDCL (20 March 2025, chapter 3), CESC (25 March 2025, paragraph 1.2), IPCL (21 January 2025, paragraphs 2.2 and 5.1), DVC (31 March 2025, paragraph 1.2) and DPL (5 March 2025, paragraph 1.2: DPL's distribution business moved to WBSEDCL from 1 January 2019); WBSEDCL company profile (wbsedcl.in)
- West Bengal Electricity Regulatory Commission
- West Bengal Renewable Energy Development Agency, home page (describes WBREDA as the State Nodal Agency for non-conventional energy programmes)