Somaya Solar Solutions Limited builds ground-mounted solar power plants in West Bengal for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in West Bengal
Solar output changes across West Bengal with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,050 to 1,390 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Adra | 1,330 | 1,380 |
| Alipur Duar | 1,150 | 1,220 |
| Asansol | 1,320 | 1,380 |
| Bagula | 1,280 | 1,330 |
| Baharampur | 1,280 | 1,340 |
| Balarampur | 1,330 | 1,380 |
| Balurghat | 1,230 | 1,300 |
| Bankura | 1,320 | 1,370 |
| Baranagar | 1,270 | 1,320 |
| Barddhaman | 1,300 | 1,350 |
| Beldanga | 1,280 | 1,340 |
| Bhadreswar | 1,270 | 1,320 |
| Bishnupur | 1,310 | 1,360 |
| Bolpur | 1,300 | 1,350 |
| Budge Budge | 1,280 | 1,330 |
| Chandrakona | 1,290 | 1,340 |
| Contai | 1,350 | 1,390 |
| Cooper's Camp | 1,280 | 1,330 |
| Dam Dam | 1,270 | 1,320 |
| Darjeeling | 1,010 | 1,050 |
| Dhulian | 1,280 | 1,350 |
| Dhupgari | 1,110 | 1,180 |
| Dinhata | 1,170 | 1,240 |
| Dubrajpur | 1,300 | 1,360 |
| Durgapur | 1,310 | 1,360 |
| Egra | 1,340 | 1,380 |
| Falakata | 1,110 | 1,180 |
| Gangarampur | 1,220 | 1,290 |
| Ghatal | 1,290 | 1,340 |
| Guskhara | 1,300 | 1,360 |
| Haldia | 1,290 | 1,340 |
| Howrah | 1,270 | 1,320 |
| Islampur | 1,200 | 1,280 |
| Jalpaiguri | 1,130 | 1,200 |
| Jangipur | 1,290 | 1,350 |
| Jhargram | 1,300 | 1,350 |
| Kalimpong | 1,090 | 1,150 |
| Kaliyaganj | 1,220 | 1,290 |
| Kalna | 1,280 | 1,330 |
| Kalyani | 1,280 | 1,330 |
| Kamarhati | 1,270 | 1,320 |
| Kandi | 1,290 | 1,340 |
| Katoya | 1,290 | 1,340 |
| Kharagpur | 1,300 | 1,340 |
| Koch Bihar | 1,150 | 1,220 |
| Kolkata | 1,270 | 1,320 |
| Krishnanagar | 1,280 | 1,340 |
| Kurseong | 1,090 | 1,150 |
| Maheshtala | 1,270 | 1,320 |
| Mainaguri | 1,120 | 1,190 |
| Malda | 1,260 | 1,330 |
| Matabhanga | 1,150 | 1,220 |
| Medinipur | 1,300 | 1,340 |
| Memari | 1,290 | 1,340 |
| Murshidabad | 1,280 | 1,340 |
| Nalhati | 1,280 | 1,340 |
| Navadwip | 1,280 | 1,330 |
| Puruliya | 1,340 | 1,390 |
| Raghunathpur | 1,330 | 1,380 |
| Raiganj | 1,230 | 1,300 |
| Rampur Hat | 1,290 | 1,340 |
| Ranaghat | 1,280 | 1,330 |
| Sainthia | 1,300 | 1,350 |
| Sankrail | 1,280 | 1,320 |
| Shantipur | 1,280 | 1,330 |
| Siliguri | 1,150 | 1,220 |
| Siuri | 1,300 | 1,350 |
| Sonamukhi | 1,310 | 1,360 |
| Tamluk | 1,280 | 1,330 |
| Titagarh | 1,270 | 1,320 |
| Tufanganj | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in West Bengal
Under WBERC's Open Access Regulations, 2022, a consumer with a contracted demand or sanctioned load of 100 kW or more can take green energy through green energy open access. There is no load limit for captive consumers taking power under green energy open access.
- Cross-subsidy surcharge for WBSEDCL's HV industrial consumers in 2025-26: ₹1.55 per unit at 11 kV, ₹1.46 at 33 kV and ₹1.00 at 132 kV. It does not apply to captive use.
- For green energy open access, the cross-subsidy surcharge may not rise by more than 50% over the level of the year in which open access is granted, for twelve years from the plant's start of operation.
- The additional surcharge is worked out by the licensee by a formula in the regulations. It does not apply to a green energy open access consumer who pays fixed or demand charges for the capacity allotted under open access.
- WBSEDCL's distribution wheeling charge for 2025-26 is ₹0.77 per unit.
- Captive plants run in parallel with the grid pay a parallel operation charge of ₹20 per kVA per month on the full plant capacity.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in West Bengal
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in West Bengal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.