Somaya Solar Solutions Limited builds ground-mounted solar power plants in Burhanpur, Madhya Pradesh for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Burhanpur
A solar plant in Burhanpur is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (27°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 14.1 lakh units | 4 to 5 acres |
| 2 MW | 28.2 lakh units | 8 to 10 acres |
| 5 MW | 70.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Madhya Pradesh
The Madhya Pradesh Renewable Energy Policy 2025 is the state's current policy for renewable energy projects. The New and Renewable Energy Department of the Government of Madhya Pradesh issued it. It stays in operation for five years from its notification in the State Gazette, or until the state notifies a new policy. It applies to projects of 500 kW or more. Rooftop and other decentralised systems of up to 2 MW follow a separate 2016 policy.
In Madhya Pradesh, open access is generally available for 1 MW and above, but a captive generating plant is not held to that limit, and renewable generators and users with a contract demand or sanctioned load of 100 kW or more can get open access. Charges for green energy open access are set by MPERC's 2023 regulations and the retail tariff order for FY 2026-27, passed on 26 March 2026.
The charges, exemptions and conditions for Madhya Pradesh are on the page Ground-Mounted Solar Plant in Madhya Pradesh.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Burhanpur
These are the Somaya Solar projects closest to Burhanpur, with straight-line distances. They are shown as references and are not in Burhanpur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 510 km from Burhanpur. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 870 km from Burhanpur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Burhanpur
Which electricity company handles solar connections in Burhanpur?
Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Burhanpur district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Burhanpur?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Burhanpur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 830 km from Burhanpur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 510 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Burhanpur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Govt of Madhya Pradesh: MP West Discom page
- GeoNames (place coordinates, CC BY 4.0)
- MPERC retail supply tariff order for FY 2026-27, 26 March 2026 (Part A3); MPERC Green Energy Open Access Charges Regulations, 2023 (G-46 of 2023) with the Second Amendment of 24 May 2024; MPERC Intra-State Open Access Regulations, 2021 with the Third Amendment of 26 July 2023
- Madhya Pradesh Renewable Energy Policy 2025 and Guidelines for its implementation (New and Renewable Energy Department, Government of Madhya Pradesh)
- PVGIS, European Commission Joint Research Centre (solar output model)