Somaya Solar Solutions Limited builds ground-mounted solar power plants in Madhya Pradesh for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Madhya Pradesh
Solar output changes across Madhya Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,410 to 1,490 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhopal | 1,370 | 1,430 |
| Burhanpur | 1,360 | 1,410 |
| Dewas | 1,380 | 1,430 |
| Gwalior | 1,400 | 1,480 |
| Indore | 1,390 | 1,440 |
| Jabalpur | 1,350 | 1,410 |
| Khandwa | 1,370 | 1,420 |
| Morena | 1,410 | 1,490 |
| Murwara | 1,370 | 1,430 |
| Ratlam | 1,380 | 1,450 |
| Rewa | 1,380 | 1,440 |
| Satna | 1,380 | 1,440 |
| Saugor | 1,360 | 1,430 |
| Singrauli | 1,360 | 1,430 |
| Ujjain | 1,380 | 1,440 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Madhya Pradesh
The Madhya Pradesh Renewable Energy Policy 2025 is the state's current policy for renewable energy projects. The New and Renewable Energy Department of the Government of Madhya Pradesh issued it. It stays in operation for five years from its notification in the State Gazette, or until the state notifies a new policy. It applies to projects of 500 kW or more. Rooftop and other decentralised systems of up to 2 MW follow a separate 2016 policy.
- Target: 20% renewable energy in the state's energy mix by FY 2024, 30% by FY 2027 and 50% by FY 2030.
- The Office of the Commissioner, New and Renewable Energy (NRE) is the nodal agency. A project must register with NRE to claim the incentives.
- The Policy applies to renewable projects of 500 kW or more. It does not apply to decentralised systems; for systems up to 2 MW at the user's premises, the Madhya Pradesh Policy for Decentralized RE Systems, 2016 prevails.
- Projects registered under the Policy get 100% exemption from electricity duty on generation for 10 years from the commercial operation date and pay no energy development cess for 10 years. They also get 50% reimbursement of stamp duty on private land and a 50% waiver of wheeling charges for 5 years from the commercial operation date.
- Government land is not given to plants built for captive use or third-party sale, except to bodies under the Government of Madhya Pradesh. Where MPERC's regulations conflict with the Policy, the regulations prevail.
In Madhya Pradesh, open access is generally available for 1 MW and above, but a captive generating plant is not held to that limit, and renewable generators and users with a contract demand or sanctioned load of 100 kW or more can get open access. Charges for green energy open access are set by MPERC's 2023 regulations and the retail tariff order for FY 2026-27, passed on 26 March 2026.
- Green energy open access is open to a consumer with a contracted demand or sanctioned load of 100 kW or more, through one connection or several connections in the same electricity division of a DISCOM.
- Banking charge is 8% of the energy banked, taken in kind each month. Banked energy that is not used by the end of the banking cycle (3 months, which the DISCOM may extend to the end of the financial year) lapses.
- Cross-subsidy surcharge for FY 2026-27: the order gives ₹1.49 per unit as the applicable surcharge for HT industrial (HV-3.1) consumers, a figure capped at 20% of the average cost of supply. The order gives this as an illustration for one connection combination, and the DISCOMs compute it for others. The surcharge is not charged where the power comes from the consumer's own captive plant.
- Additional surcharge for FY 2026-27 is ₹1.18 per unit. It is not charged on open access energy up to the consumer's contract demand if fixed charges are paid. It is charged on energy above the contract demand, and it is not charged for captive use.
- Wheeling charges for FY 2026-27 are ₹0.17 per kWh at 33 kV and ₹0.69 per kWh at 11 kV. Standby charges are 0.25 times the consumer's applicable tariff.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar in Madhya Pradesh
Somaya Solar's published projects in Madhya Pradesh:
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Madhya Pradesh
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Madhya Pradesh are: KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni).
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Madhya Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- MPERC retail supply tariff order for FY 2026-27, 26 March 2026 (Part A3); MPERC Green Energy Open Access Charges Regulations, 2023 (G-46 of 2023) with the Second Amendment of 24 May 2024; MPERC Intra-State Open Access Regulations, 2021 with the Third Amendment of 26 July 2023
- Madhya Pradesh Renewable Energy Policy 2025 and Guidelines for its implementation (New and Renewable Energy Department, Government of Madhya Pradesh)
- PVGIS, European Commission Joint Research Centre (solar output model)