Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Madhya Pradesh and what we do on such a project.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components.
- Component A: decentralised solar plants of up to 2 MW on farmers' land.
- Component B: solar pumps for agriculture.
- Component C: solarisation of grid-connected agriculture pumps, including feeder-level solarisation.
Who runs PM-KUSUM in Madhya Pradesh
In Madhya Pradesh the Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) is the State Implementing Agency for PM-KUSUM, as designated by the Ministry of New and Renewable Energy. MPERC fixed a tariff for Component A plants of 500 kW to 2 MW, for sale of their power to the state power management company (MPPMCL) and the DISCOMs.
- Progress reported to the Lok Sabha up to 30 June 2026. Component A: 4.00 MW in 2022-23, 12.13 MW in 2023-24, 34.00 MW in 2024-25, 54.65 MW in 2025-26 and 96.88 MW in 2026-27 so far, about 201.66 MW in all. Component B: 7,234 pumps in 2020-21, 91 in 2022-23, 2,435 in 2025-26 and 14,922 in 2026-27 so far, 24,682 in all. Component C: 7,417 pumps solarised in 2024-25, 44,598 in 2025-26 and 10,363 in 2026-27 so far, 62,378 in all. The totals are our sums of the yearly figures.
- In its order of 16 February 2021, MPERC fixed a levelised tariff of ₹3.07 per kWh for Component A plants commissioned up to 31 March 2024. It also acts as the ceiling for bidding, and the power purchase agreement runs for 25 years. On 19 February 2024 MPERC extended this control period until further orders. Confirm the tariff in force with MPUVNL or the DISCOM before signing.
- The central government has extended the scheme to 31 March 2027 for all components.
What a PM-KUSUM plant produces in Madhya Pradesh
Solar output changes across Madhya Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,410 to 1,490 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhopal | 1,370 | 1,430 |
| Burhanpur | 1,360 | 1,410 |
| Dewas | 1,380 | 1,430 |
| Gwalior | 1,400 | 1,480 |
| Indore | 1,390 | 1,440 |
| Jabalpur | 1,350 | 1,410 |
| Khandwa | 1,370 | 1,420 |
| Morena | 1,410 | 1,490 |
| Murwara | 1,370 | 1,430 |
| Ratlam | 1,380 | 1,450 |
| Rewa | 1,380 | 1,440 |
| Satna | 1,380 | 1,440 |
| Saugor | 1,360 | 1,430 |
| Singrauli | 1,360 | 1,430 |
| Ujjain | 1,380 | 1,440 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
PM-KUSUM plants built by Somaya Solar
Somaya Solar's published projects in Madhya Pradesh:
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Madhya Pradesh
Who do I apply to for PM-KUSUM in Madhya Pradesh?
In Madhya Pradesh the Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) is the State Implementing Agency for PM-KUSUM, as designated by the Ministry of New and Renewable Energy. MPERC fixed a tariff for Component A plants of 500 kW to 2 MW, for sale of their power to the state power management company (MPPMCL) and the DISCOMs.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Madhya Pradesh are: KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni).
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Madhya Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy)
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy); MPERC order of 16 February 2021 (Petition 50 of 2020) and extension order of 19 February 2024
- PVGIS, European Commission Joint Research Centre (solar output model)