Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Jabalpur, Madhya Pradesh.

Jabalpur at a glance for solar projects

District and stateJabalpur district, Madhya Pradesh
Electricity supplyMadhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (MPPKVVCL) supplies electricity in Jabalpur district, one of the districts it lists as its area.
Electricity regulatorMadhya Pradesh Electricity Regulatory Commission (MPERC)
State renewable energy agencyOffice of the Commissioner, New and Renewable Energy, Government of Madhya Pradesh (NRE)
State solar policyMadhya Pradesh Renewable Energy Policy 2025 (in force for five years from its notification in the State Gazette, or until a new policy replaces it)
Rooftop metering for businessesNet metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW
Modelled solar outputabout 1,350 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 660 km from Jabalpur in a straight line

Solar services in Jabalpur

Local points for solar projects in Jabalpur

The Government of India's One District One Product (ODOP) list names Peas as the product of Jabalpur district.

Solar output in Jabalpur

A solar plant in Jabalpur is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HV-3.1), 11 kV supply energy charge of ₹7.79 per kWh (MPERC retail supply tariff order for FY 2026-27, Petition No. 140/2025, passed 26 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate of ₹7.79 per unit applies to energy up to 50% load factor; energy above 50% load factor is ₹6.79. A monthly fixed charge of ₹409 per kVA of billing demand also applies at 11 kV. At 33 kV the energy charge is ₹7.75 and ₹6.70, with a fixed charge of ₹641 per kVA. At 132 kV it is ₹7.34 and ₹6.35, with ₹729 per kVA. At 220/400 kV it is ₹6.89 and ₹5.89, with ₹729 per kVA. Time-of-day rebate or surcharge applies as set in the general terms of the HT tariff. A rebate of ₹1 per unit applies to new HT connections and, as an alternative, to incremental consumption of existing consumers, on the conditions in the order. The rates exclude taxes and duties. The same tariff order covers all three DISCOMs.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.79 per kWh
100 kW1.4 lakh units1,000 sq m₹10.5 lakh
500 kW6.8 lakh units5,000 sq m₹52.6 lakh
1 MW13.5 lakh units10,000 sq m₹1.05 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Jabalpur

For a rooftop array in Jabalpur the strongest month is April, at about 142 units for each kW installed, and the weakest is July, at about 72. For a ground-mounted array at a 29° tilt the strongest month is March (about 146) and the weakest is July (about 66). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January119142
February121136
March140146
April142136
May140127
June10795
July7266
August7369
September9495
October120130
November113133
December114139

Somaya Solar projects near Jabalpur

These are the Somaya Solar projects closest to Jabalpur, with straight-line distances. They are shown as references and are not in Jabalpur unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 90 km from Jabalpur. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 520 km from Jabalpur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 650 km from Jabalpur. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Jabalpur

Which electricity company handles solar connections in Jabalpur?

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (MPPKVVCL) supplies electricity in Jabalpur district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Jabalpur?

Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW. The rule is the same across Madhya Pradesh.

How much electricity does a solar plant generate in Jabalpur?

About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Jabalpur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 660 km from Jabalpur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 90 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jabalpur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image