Somaya Solar Solutions Limited delivers turnkey solar projects in Jabalpur, Madhya Pradesh: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Jabalpur
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (MPPKVVCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Jabalpur
In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.
The size limits, charges and other conditions for Madhya Pradesh are on the page Turnkey Solar EPC in Madhya Pradesh.
In Jabalpur the application for connection and metering goes to MPPKVVCL.
What to expect from the plant in Jabalpur
A solar plant in Jabalpur is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HV-3.1), 11 kV supply energy charge of ₹7.79 per kWh (MPERC retail supply tariff order for FY 2026-27, Petition No. 140/2025, passed 26 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate of ₹7.79 per unit applies to energy up to 50% load factor; energy above 50% load factor is ₹6.79. A monthly fixed charge of ₹409 per kVA of billing demand also applies at 11 kV. At 33 kV the energy charge is ₹7.75 and ₹6.70, with a fixed charge of ₹641 per kVA. At 132 kV it is ₹7.34 and ₹6.35, with ₹729 per kVA. At 220/400 kV it is ₹6.89 and ₹5.89, with ₹729 per kVA. Time-of-day rebate or surcharge applies as set in the general terms of the HT tariff. A rebate of ₹1 per unit applies to new HT connections and, as an alternative, to incremental consumption of existing consumers, on the conditions in the order. The rates exclude taxes and duties. The same tariff order covers all three DISCOMs.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.79 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.5 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹52.6 lakh |
| 1 MW | 13.5 lakh units | 10,000 sq m | ₹1.05 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Jabalpur
These are the Somaya Solar projects closest to Jabalpur, with straight-line distances. They are shown as references and are not in Jabalpur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 90 km from Jabalpur. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 520 km from Jabalpur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 650 km from Jabalpur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Jabalpur
Which electricity company handles solar connections in Jabalpur?
Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (MPPKVVCL) supplies electricity in Jabalpur district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Jabalpur?
Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW. The rule is the same across Madhya Pradesh.
How much electricity does a solar plant generate in Jabalpur?
About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Jabalpur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 660 km from Jabalpur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 90 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Jabalpur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Govt of Madhya Pradesh: MP East Discom page
- GeoNames (place coordinates, CC BY 4.0)
- MPERC (Grid Interactive Renewable Energy Systems and Related Matters) Regulations [Revision II], 2024 {RG-39(II) of 2024}, dated 14 March 2024, with the First Amendment of 18 June 2026
- MPERC ARR and Retail Supply Tariff Order for FY 2026-27, 26 March 2026 (tariff schedule HV-3)
- PVGIS, European Commission Joint Research Centre (solar output model)