Commercial and Industrial Rooftop Solar in Madhya Pradesh

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Madhya Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Metering rules for business rooftops in Madhya Pradesh

In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.

  • A plant under net metering may not be larger than the consumer's contract demand (demand-based tariff) or sanctioned load (load-based tariff). Group and virtual net metering plants may not exceed the total of the contract demands or sanctioned loads of the parent consumer and the participating consumers.
  • Existing net metering consumers with more than 500 kW installed keep the net metering benefit. The smallest plant allowed is 1 kW.
  • The total of renewable systems on one distribution transformer may not exceed 80% of its rated capacity. For an HT consumer, the plant may not exceed 80% of the rated capacity of the transformer that supplies the consumer.
  • Under net metering, extra energy exported in a billing period is carried forward as credit. The settlement period runs from the first day of the billing month of October to the last day of the billing month of September. Credit left at the end of the period is paid by the DISCOM by 15 November, at the lowest solar or wind tariff discovered in bidding in the state in the preceding financial year.
  • A consumer with a net metering or gross metering plant, own or leased from a RESCO, does not pay banking charges, wheeling charges, cross-subsidy surcharge or additional surcharge. The same consumer may not use open access under the state's Intra-State Open Access Regulations.
  • A consumer with net metering may not also take gross metering or virtual net metering. Consumers with arrears may not use any of these arrangements.
  • The first amendment, notified on 18 June 2026, mainly concerns the PM Surya Ghar Muft Bijli Yojana: no processing fee, no separate agreement (it is signed online with the application) and no meter testing fee for connections under that scheme.

Output and bill value for a rooftop plant in Madhya Pradesh

Solar output changes across Madhya Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,350 to 1,410 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Bhopal1,3701,430
Burhanpur1,3601,410
Dewas1,3801,430
Gwalior1,4001,480
Indore1,3901,440
Jabalpur1,3501,410
Khandwa1,3701,420
Morena1,4101,490
Murwara1,3701,430
Ratlam1,3801,450
Rewa1,3801,440
Satna1,3801,440
Saugor1,3601,430
Singrauli1,3601,430
Ujjain1,3801,440

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Questions about solar projects in Madhya Pradesh

Is net metering available for factories and commercial buildings in Madhya Pradesh?

In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Madhya Pradesh are: KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni).

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Madhya Pradesh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.