Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Charkhari, Uttar Pradesh.

Charkhari at a glance for solar projects

District and stateMahoba district, Uttar Pradesh
Electricity supplyDakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Mahoba district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,390 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 430 km from Charkhari in a straight line

Solar services in Charkhari

Local points for solar projects in Charkhari

The Government of India's One District One Product (ODOP) list names Gaura Stone Craft and Metal Crafts as the product of Mahoba district.

Solar output in Charkhari

A solar plant in Charkhari is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.9 lakh
500 kW7.0 lakh units5,000 sq m₹49.3 lakh
1 MW13.9 lakh units10,000 sq m₹98.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Charkhari

For a rooftop array in Charkhari the strongest month is April, at about 144 units for each kW installed, and the weakest is July, at about 86. For a ground-mounted array at a 30° tilt the strongest month is March (about 148) and the weakest is July (about 79). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January114139
February118134
March141148
April144139
May143130
June115102
July8679
August8985
September101103
October121134
November110131
December109136

Somaya Solar projects near Charkhari

These are the Somaya Solar projects closest to Charkhari, with straight-line distances. They are shown as references and are not in Charkhari unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 190 km from Charkhari. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 280 km from Charkhari. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 410 km from Charkhari. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Charkhari

Which electricity company handles solar connections in Charkhari?

Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL) supplies electricity in Mahoba district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Charkhari?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Charkhari?

About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Charkhari?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 430 km from Charkhari in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 190 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Charkhari

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image