Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Chirkunda, Jharkhand as an EPC contractor: engineering, supply, construction and commissioning.
What Jharkhand's policy says about large solar plants
The Jharkhand State Solar Policy 2022 is the state's current solar policy. The Department of Energy issued it by resolution dated 5 July 2022. It stays valid for five years from notification unless another policy replaces it.
Under JSERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. A captive consumer has no load limit.
The charges, exemptions and conditions for Jharkhand are on the page Utility-Scale Solar in Jharkhand.
Output and land at megawatt scale in Chirkunda
A solar plant in Chirkunda is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (29°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 69.0 lakh units | 20 to 25 acres |
| 10 MW | 1.38 crore units | 40 to 50 acres |
| 25 MW | 3.45 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Chirkunda
These are the Somaya Solar projects closest to Chirkunda, with straight-line distances. They are shown as references and are not in Chirkunda unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 650 km from Chirkunda. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1010 km from Chirkunda. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Chirkunda
Which electricity company handles solar connections in Chirkunda?
Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Dhanbad district.
How much electricity does a solar plant generate in Chirkunda?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Chirkunda?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1080 km from Chirkunda in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 650 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Chirkunda
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024, notified 9 May 2024; JSERC order for JBVNL dated 25 March 2026 (chapter 10)
- JSERC, List of Distribution Licensees in Jharkhand
- Jharkhand State Solar Policy 2022 (Department of Energy, Government of Jharkhand, Resolution dated 5 July 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)