Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Dewas, Madhya Pradesh as an EPC contractor: engineering, supply, construction and commissioning.
What Madhya Pradesh's policy says about large solar plants
The Madhya Pradesh Renewable Energy Policy 2025 is the state's current policy for renewable energy projects. The New and Renewable Energy Department of the Government of Madhya Pradesh issued it. It stays in operation for five years from its notification in the State Gazette, or until the state notifies a new policy. It applies to projects of 500 kW or more. Rooftop and other decentralised systems of up to 2 MW follow a separate 2016 policy.
In Madhya Pradesh, open access is generally available for 1 MW and above, but a captive generating plant is not held to that limit, and renewable generators and users with a contract demand or sanctioned load of 100 kW or more can get open access. Charges for green energy open access are set by MPERC's 2023 regulations and the retail tariff order for FY 2026-27, passed on 26 March 2026.
The charges, exemptions and conditions for Madhya Pradesh are on the page Utility-Scale Solar in Madhya Pradesh.
Output and land at megawatt scale in Dewas
A solar plant in Dewas is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (30°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 71.5 lakh units | 20 to 25 acres |
| 10 MW | 1.43 crore units | 40 to 50 acres |
| 25 MW | 3.58 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Dewas
These are the Somaya Solar projects closest to Dewas, with straight-line distances. They are shown as references and are not in Dewas unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 450 km from Dewas. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 700 km from Dewas. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Dewas
Which electricity company handles solar connections in Dewas?
Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) supplies electricity in Dewas district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Dewas?
About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Dewas?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 650 km from Dewas in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 450 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dewas
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Govt of Madhya Pradesh: MP West Discom page
- GeoNames (place coordinates, CC BY 4.0)
- MPERC retail supply tariff order for FY 2026-27, 26 March 2026 (Part A3); MPERC Green Energy Open Access Charges Regulations, 2023 (G-46 of 2023) with the Second Amendment of 24 May 2024; MPERC Intra-State Open Access Regulations, 2021 with the Third Amendment of 26 July 2023
- Madhya Pradesh Renewable Energy Policy 2025 and Guidelines for its implementation (New and Renewable Energy Department, Government of Madhya Pradesh)
- PVGIS, European Commission Joint Research Centre (solar output model)