Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Dhariwal, Punjab.

Dhariwal at a glance for solar projects

District and stateGurdaspur district, Punjab
Electricity supplyPunjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Gurdaspur district.
Electricity regulatorPunjab State Electricity Regulatory Commission (PSERC)
State renewable energy agencyPunjab Energy Development Agency (PEDA)
State solar policyNew and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy)
Rooftop metering for businessesNet metering up to 500 kWp, within the sanctioned load
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 420 km from Dhariwal in a straight line

Solar services in Dhariwal

Local points for solar projects in Dhariwal

The Government of India's One District One Product (ODOP) list names Foundry Cluster and Jaggery as the products of Gurdaspur district.

Solar output in Dhariwal

A solar plant in Dhariwal is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.90 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.0 lakh
500 kW6.8 lakh units5,000 sq m₹40.1 lakh
1 MW13.6 lakh units10,000 sq m₹80.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Dhariwal

For a rooftop array in Dhariwal the strongest month is May, at about 142 units for each kW installed, and the weakest is January, at about 90. For a ground-mounted array at a 34° tilt the strongest month is March (about 139) and the weakest is July (about 97). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January90117
February99119
March128139
April136134
May142130
June130115
July10897
August106102
September110115
October117137
November99127
December93127

Somaya Solar projects near Dhariwal

These are the Somaya Solar projects closest to Dhariwal, with straight-line distances. They are shown as references and are not in Dhariwal unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 340 km from Dhariwal. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 350 km from Dhariwal. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 450 km from Dhariwal. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Dhariwal

Which electricity company handles solar connections in Dhariwal?

Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Gurdaspur district.

Is net metering available for factories and commercial buildings in Dhariwal?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.

How much electricity does a solar plant generate in Dhariwal?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Dhariwal?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 420 km from Dhariwal in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 340 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Dhariwal

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.