Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Dinanagar, Punjab.
Dinanagar at a glance for solar projects
| District and state | Gurdaspur district, Punjab |
|---|---|
| Electricity supply | Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Gurdaspur district. |
| Electricity regulator | Punjab State Electricity Regulatory Commission (PSERC) |
| State renewable energy agency | Punjab Energy Development Agency (PEDA) |
| State solar policy | New and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,340 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 430 km from Dinanagar in a straight line |
Solar services in Dinanagar
- Solar EPC Company in Dinanagar
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Dinanagar
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Dinanagar
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Dinanagar
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Dinanagar
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Dinanagar
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Dinanagar
The Government of India's One District One Product (ODOP) list names Foundry Cluster and Jaggery as the products of Gurdaspur district.
Solar output in Dinanagar
A solar plant in Dinanagar is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.90 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹7.9 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹39.5 lakh |
| 1 MW | 13.4 lakh units | 10,000 sq m | ₹79.1 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Dinanagar
For a rooftop array in Dinanagar the strongest month is May, at about 141 units for each kW installed, and the weakest is January, at about 89. For a ground-mounted array at a 34° tilt the strongest month is March (about 137) and the weakest is July (about 95). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 89 | 117 |
| February | 97 | 116 |
| March | 126 | 137 |
| April | 134 | 133 |
| May | 141 | 129 |
| June | 130 | 115 |
| July | 106 | 95 |
| August | 104 | 100 |
| September | 109 | 114 |
| October | 116 | 136 |
| November | 97 | 126 |
| December | 92 | 126 |
Somaya Solar projects near Dinanagar
These are the Somaya Solar projects closest to Dinanagar, with straight-line distances. They are shown as references and are not in Dinanagar unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 350 km from Dinanagar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 350 km from Dinanagar. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 460 km from Dinanagar. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Dinanagar
Which electricity company handles solar connections in Dinanagar?
Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Gurdaspur district.
Is net metering available for factories and commercial buildings in Dinanagar?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.
How much electricity does a solar plant generate in Dinanagar?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dinanagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 430 km from Dinanagar in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 350 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dinanagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- New and Renewable Sources of Energy (NRSE) Policy, 2012, Government of Punjab notification of 26 December 2012, with the amendment of 9 July 2015
- New and Renewable Sources of Energy (NRSE) Policy, 2012, clause 4.2 (Government of Punjab, 26 December 2012), and the PEDA website
- PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, with the Third Amendment notified on 7 April 2026 (Punjab Government Gazette, 11 April 2026)
- PSERC Tariff Order FY 2026-27 for PSPCL (order dated 06 March 2026), Chapter 1, page 1
- PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, Annexure II (Schedules of Tariff), Schedule SI.3
- PVGIS, European Commission Joint Research Centre (solar output model)
- Punjab State Electricity Regulatory Commission
- State Election Commission Punjab: "List of District-wise Class-I, II, III and Nagar Panchayats in the State of Punjab" (scanned page 5, posted 14 Aug 2023; includes bodies constituted up to 30-12-2021; 23 districts; quote read from the scanned image)