Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Digboi, Assam.

Digboi at a glance for solar projects

District and stateTinsukia district, Assam
Electricity supplyAssam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Tinsukia district.
Electricity regulatorAssam Electricity Regulatory Commission (AERC)
State renewable energy agencyAssam Energy Development Agency (AEDA)
State solar policyAssam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesRooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand
Modelled solar outputabout 1,120 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1790 km from Digboi in a straight line

Solar services in Digboi

Local points for solar projects in Digboi

The Government of India's One District One Product (ODOP) list names Assam Lemon as the product of Tinsukia district.

Solar output in Digboi

A solar plant in Digboi is modelled to produce about 1,120 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.09 per kWh
100 kW1.1 lakh units1,000 sq m₹9.1 lakh
500 kW5.6 lakh units5,000 sq m₹45.3 lakh
1 MW11.2 lakh units10,000 sq m₹90.6 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Digboi

For a rooftop array in Digboi the strongest month is March, at about 110 units for each kW installed, and the weakest is July, at about 76. For a ground-mounted array at a 33° tilt the strongest month is January (about 121) and the weakest is July (about 68). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January96121
February92106
March110116
April10399
May10393
June8272
July7668
August8580
September8788
October96108
November94115
December92119

Somaya Solar projects near Digboi

These are the Somaya Solar projects closest to Digboi, with straight-line distances. They are shown as references and are not in Digboi unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1550 km from Digboi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1580 km from Digboi. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1640 km from Digboi. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Digboi

Which electricity company handles solar connections in Digboi?

Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Tinsukia district.

Is net metering available for factories and commercial buildings in Digboi?

Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.

How much electricity does a solar plant generate in Digboi?

About 1,120 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Digboi?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1790 km from Digboi in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1550 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Digboi

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image