Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Assam.
Assam at a glance for solar projects
| Electricity regulator | Assam Electricity Regulatory Commission (AERC) |
|---|---|
| State renewable energy agency | Assam Energy Development Agency (AEDA) |
| Electricity distribution | APDCL (The state distribution company (State DISCOM) of Assam) |
| State solar policy | Assam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand |
Solar services in Assam
- Solar EPC Company in Assam
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Assam
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Assam
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Assam
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Assam
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Assam
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Assam
Solar output changes across Assam with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,100 to 1,260 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Barpeta | 1,180 | 1,240 |
| Barpeta Road | 1,140 | 1,200 |
| Bilasipara | 1,170 | 1,240 |
| Biswanath Chariali | 1,150 | 1,220 |
| Bongaigaon | 1,160 | 1,230 |
| Chapar | 1,150 | 1,220 |
| Dergaon | 1,150 | 1,210 |
| Dhekiajuli | 1,130 | 1,200 |
| Dhing | 1,160 | 1,230 |
| Dhubri | 1,170 | 1,250 |
| Dibrugarh | 1,150 | 1,220 |
| Digboi | 1,120 | 1,190 |
| Diphu | 1,210 | 1,270 |
| Dum Duma | 1,130 | 1,200 |
| Garamur | 1,150 | 1,220 |
| Gauripur | 1,180 | 1,250 |
| Goalpara | 1,160 | 1,230 |
| Golaghat | 1,150 | 1,210 |
| Guwahati | 1,170 | 1,240 |
| Haflong | 1,260 | 1,320 |
| Hailakandi | 1,230 | 1,290 |
| Hamren | 1,180 | 1,230 |
| Hojai | 1,190 | 1,250 |
| Jorhat | 1,150 | 1,210 |
| Kokrajhar | 1,150 | 1,220 |
| Lanka | 1,200 | 1,250 |
| Mangaldai | 1,160 | 1,230 |
| Margherita | 1,130 | 1,200 |
| Mariani | 1,150 | 1,210 |
| Morigaon | 1,170 | 1,230 |
| Mushalpur | 1,170 | 1,240 |
| Nagaon | 1,170 | 1,240 |
| Nalbari | 1,180 | 1,260 |
| North Lakhimpur | 1,140 | 1,210 |
| Rangia | 1,180 | 1,250 |
| Sibsagar | 1,150 | 1,210 |
| Silapathar | 1,100 | 1,170 |
| Silchar | 1,230 | 1,290 |
| Sonari | 1,150 | 1,220 |
| Tezpur | 1,160 | 1,230 |
| Tinsukia | 1,140 | 1,210 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Assam
- Barpeta
- Barpeta Road
- Bilasipara
- Biswanath Chariali
- Bongaigaon
- Chapar
- Dergaon
- Dhekiajuli
- Dhing
- Dhubri
- Dibrugarh
- Digboi
- Diphu
- Dum Duma
- Garamur
- Gauripur
- Goalpara
- Golaghat
- Guwahati
- Haflong
- Hailakandi
- Hamren
- Hojai
- Jorhat
- Kokrajhar
- Lanka
- Mangaldai
- Margherita
- Mariani
- Morigaon
- Mushalpur
- Nagaon
- Nalbari
- North Lakhimpur
- Rangia
- Sibsagar
- Silapathar
- Silchar
- Sonari
- Tezpur
- Tinsukia
Questions about solar projects in Assam
Is net metering available for factories and commercial buildings in Assam?
In Assam, rooftop solar is governed by the AERC (Grid Interactive Solar PV Systems) Regulations, 2019, notified on 6 August 2019 and amended on 18 June 2024. APDCL has asked the regulator to cut net metering benefits and stop paying for surplus energy. AERC has not changed the rules. On 5 August 2026 it told APDCL to keep processing applications under the existing rules while the petition is pending.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Assam
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AERC order sheet of 5 August 2026, Petition No. 09/2026, which reproduces the AERC (Grid Interactive Solar PV Systems) Regulations, 2019 and the First Amendment of 18 June 2024; Assam Integrated Clean Energy Policy, 2025, clause 6.1
- Assam Electricity Regulatory Commission
- Assam Energy Development Agency, What We Do (State Nodal Agency of MNRE); AEDA page on PM KUSUM Component B
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam), definition 60: State DISCOMs means APDCL; APDCL notice of tariff schedule w.e.f. 1 April 2026
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam, notification PEL.19/2025/13, 24 February 2025); AERC order of 5 August 2026 (Petition No. 09/2026)
- PVGIS, European Commission Joint Research Centre (solar output model)