Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Mariani, Assam.
Mariani at a glance for solar projects
| District and state | Jorhat district, Assam |
|---|---|
| Electricity supply | Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Jorhat district. |
| Electricity regulator | Assam Electricity Regulatory Commission (AERC) |
| State renewable energy agency | Assam Energy Development Agency (AEDA) |
| State solar policy | Assam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand |
| Modelled solar output | about 1,150 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1670 km from Mariani in a straight line |
Solar services in Mariani
- Solar EPC Company in Mariani
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Mariani
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Mariani
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Mariani
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Mariani
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Mariani
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Mariani
The Government of India's One District One Product (ODOP) list names Bhoot Jholokia as the product of Jorhat district.
Solar output in Mariani
A solar plant in Mariani is modelled to produce about 1,150 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.09 per kWh |
|---|---|---|---|
| 100 kW | 1.1 lakh units | 1,000 sq m | ₹9.3 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹46.5 lakh |
| 1 MW | 11.5 lakh units | 10,000 sq m | ₹93.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Mariani
For a rooftop array in Mariani the strongest month is March, at about 118 units for each kW installed, and the weakest is July, at about 85. For a ground-mounted array at a 31° tilt the strongest month is March (about 124) and the weakest is July (about 77). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 95 | 116 |
| February | 95 | 108 |
| March | 118 | 124 |
| April | 109 | 106 |
| May | 107 | 97 |
| June | 88 | 79 |
| July | 85 | 77 |
| August | 89 | 84 |
| September | 90 | 91 |
| October | 96 | 106 |
| November | 91 | 110 |
| December | 90 | 112 |
Somaya Solar projects near Mariani
These are the Somaya Solar projects closest to Mariani, with straight-line distances. They are shown as references and are not in Mariani unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1430 km from Mariani. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1430 km from Mariani. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1530 km from Mariani. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Mariani
Which electricity company handles solar connections in Mariani?
Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Jorhat district.
Is net metering available for factories and commercial buildings in Mariani?
Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.
How much electricity does a solar plant generate in Mariani?
About 1,150 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mariani?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1670 km from Mariani in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1430 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mariani
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AERC order sheet of 5 August 2026, Petition No. 09/2026, which reproduces the AERC (Grid Interactive Solar PV Systems) Regulations, 2019 and the First Amendment of 18 June 2024; Assam Integrated Clean Energy Policy, 2025, clause 6.1
- APDCL notice of tariff schedule w.e.f. 1 April 2026 (AERC order of 6 March 2026); AERC press release of 6 March 2026
- Assam Electricity Regulatory Commission
- Assam Energy Development Agency, What We Do (State Nodal Agency of MNRE); AEDA page on PM KUSUM Component B
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam, notification PEL.19/2025/13, 24 February 2025); AERC order of 5 August 2026 (Petition No. 09/2026)
- Assam Integrated Clean Energy Policy, 2025, definitions
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)