Utility-Scale Solar Power Plant Installation in Assam

Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Assam as an EPC contractor: engineering, supply, construction and commissioning.

What Assam's policy says about large solar plants

The Government of Assam notified the Assam Integrated Clean Energy Policy, 2025 on 24 February 2025. It covers solar, wind and other clean energy projects. It stays in force until 31 March 2030 or until another policy replaces it. The regulator's order of 5 August 2026 also refers to a separate Assam Solar Generation Promotion Policy, 2025, notified on 5 June 2025.

  • Target: 11,700 MW of renewable power projects up to 2029-30, including 1,000 MW of rooftop solar at industrial and commercial sites.
  • APDCL, or another agency the state notifies, is the nodal agency under the policy.
  • A captive solar plant for use within the state is limited to the consumer's contract demand. A consumer's plant may sell surplus power to APDCL at 75% of the APPC rate.
  • Cross-subsidy surcharge and additional surcharge do not apply to power from clean energy projects that meet the captive generating plant criteria.
  • Electricity duty is fully exempt on power consumed from renewable plants during the policy period, from the date of commissioning.

Open access in Assam is governed by the AERC (Terms and Conditions for Open Access) Regulations, 2024, published in the Assam Gazette on 4 December 2024. The tariff schedule for 2026-27 sets the open access charges below. The notice does not list an additional surcharge or a banking charge.

  • A draft first amendment dated 24 September 2025 would allow green energy open access to consumers with a contracted demand or sanctioned load of 100 kW and above, also through several connections added together in one electricity division. It says there is no limit on load for captive use of green energy.
  • Cross-subsidy surcharge for 2026-27: ₹1.81 per kWh for HT Industries-I and HT Industries-II, and ₹1.32 per kWh for HT Small Industries.
  • Wheeling charge at 33 kV is ₹0.27 per kWh. Wheeling losses are 5% at 33 kV and 11% at 11 kV.
  • Standby charge for HT Industries-II (above 150 kVA) is ₹2.49 per kWh.
  • The state clean energy policy says cross-subsidy surcharge and additional surcharge do not apply to power from a plant that meets the captive generating plant criteria.

Output and land at megawatt scale in Assam

Solar output changes across Assam with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,170 to 1,320 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Barpeta1,1801,240
Barpeta Road1,1401,200
Bilasipara1,1701,240
Biswanath Chariali1,1501,220
Bongaigaon1,1601,230
Chapar1,1501,220
Dergaon1,1501,210
Dhekiajuli1,1301,200
Dhing1,1601,230
Dhubri1,1701,250
Dibrugarh1,1501,220
Digboi1,1201,190
Diphu1,2101,270
Dum Duma1,1301,200
Garamur1,1501,220
Gauripur1,1801,250
Goalpara1,1601,230
Golaghat1,1501,210
Guwahati1,1701,240
Haflong1,2601,320
Hailakandi1,2301,290
Hamren1,1801,230
Hojai1,1901,250
Jorhat1,1501,210
Kokrajhar1,1501,220
Lanka1,2001,250
Mangaldai1,1601,230
Margherita1,1301,200
Mariani1,1501,210
Morigaon1,1701,230
Mushalpur1,1701,240
Nagaon1,1701,240
Nalbari1,1801,260
North Lakhimpur1,1401,210
Rangia1,1801,250
Sibsagar1,1501,210
Silapathar1,1001,170
Silchar1,2301,290
Sonari1,1501,220
Tezpur1,1601,230
Tinsukia1,1401,210

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Assam

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Assam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.