Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Goalpara, Assam.

Goalpara at a glance for solar projects

District and stateGoalpara district, Assam
Electricity supplyAssam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Goalpara district.
Electricity regulatorAssam Electricity Regulatory Commission (AERC)
State renewable energy agencyAssam Energy Development Agency (AEDA)
State solar policyAssam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesRooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand
Modelled solar outputabout 1,160 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1330 km from Goalpara in a straight line

Solar services in Goalpara

Local points for solar projects in Goalpara

The Government of India's One District One Product (ODOP) list names Banana as the product of Goalpara district.

Solar output in Goalpara

A solar plant in Goalpara is modelled to produce about 1,160 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.09 per kWh
100 kW1.2 lakh units1,000 sq m₹9.4 lakh
500 kW5.8 lakh units5,000 sq m₹46.9 lakh
1 MW11.6 lakh units10,000 sq m₹93.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Goalpara

For a rooftop array in Goalpara the strongest month is March, at about 125 units for each kW installed, and the weakest is June, at about 80. For a ground-mounted array at a 32° tilt the strongest month is March (about 131) and the weakest is June (about 71). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January102125
February104120
March125131
April108104
May9990
June8071
July8274
August8681
September8686
October98109
November98118
December96121

Somaya Solar projects near Goalpara

These are the Somaya Solar projects closest to Goalpara, with straight-line distances. They are shown as references and are not in Goalpara unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1060 km from Goalpara. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1080 km from Goalpara. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1200 km from Goalpara. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Goalpara

Which electricity company handles solar connections in Goalpara?

Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Goalpara district.

Is net metering available for factories and commercial buildings in Goalpara?

Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.

How much electricity does a solar plant generate in Goalpara?

About 1,160 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Goalpara?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1330 km from Goalpara in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1060 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Goalpara

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.