Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Goalpara, Assam as an EPC contractor: engineering, supply, construction and commissioning.
What Assam's policy says about large solar plants
The Government of Assam notified the Assam Integrated Clean Energy Policy, 2025 on 24 February 2025. It covers solar, wind and other clean energy projects. It stays in force until 31 March 2030 or until another policy replaces it. The regulator's order of 5 August 2026 also refers to a separate Assam Solar Generation Promotion Policy, 2025, notified on 5 June 2025.
Open access in Assam is governed by the AERC (Terms and Conditions for Open Access) Regulations, 2024, published in the Assam Gazette on 4 December 2024. The tariff schedule for 2026-27 sets the open access charges below. The notice does not list an additional surcharge or a banking charge.
The charges, exemptions and conditions for Assam are on the page Utility-Scale Solar in Assam.
Output and land at megawatt scale in Goalpara
A solar plant in Goalpara is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 61.5 lakh units | 20 to 25 acres |
| 10 MW | 1.23 crore units | 40 to 50 acres |
| 25 MW | 3.08 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Goalpara
These are the Somaya Solar projects closest to Goalpara, with straight-line distances. They are shown as references and are not in Goalpara unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1060 km from Goalpara. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1240 km from Goalpara. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Goalpara
Which electricity company handles solar connections in Goalpara?
Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Goalpara district.
How much electricity does a solar plant generate in Goalpara?
About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Goalpara?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1330 km from Goalpara in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1060 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Goalpara
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APDCL notice of tariff schedule w.e.f. 1 April 2026 (AERC order of 6 March 2026); AERC draft notification of 24 September 2025 (Open Access Regulations, 2024, First Amendment); Assam Integrated Clean Energy Policy, 2025, clause 5.8
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam, notification PEL.19/2025/13, 24 February 2025); AERC order of 5 August 2026 (Petition No. 09/2026)
- Assam Integrated Clean Energy Policy, 2025, definitions