Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Resubelpara, Meghalaya.

Resubelpara at a glance for solar projects

District and stateNorth Garo Hills district, Meghalaya
Electricity supplyMeghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies North Garo Hills district.
Electricity regulatorMeghalaya State Electricity Regulatory Commission (MSERC)
State renewable energy agencyMeghalaya New and Renewable Energy Development Agency (MNREDA)
State solar policyMeghalaya Power Policy, 2024 (in force until 31 March 2030 unless notified otherwise)
Rooftop metering for businessesCommercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW
Modelled solar outputabout 1,160 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1330 km from Resubelpara in a straight line

Solar services in Resubelpara

Local points for solar projects in Resubelpara

The Government of India's One District One Product (ODOP) list names Banana as the product of North Garo Hills district.

Solar output in Resubelpara

A solar plant in Resubelpara is modelled to produce about 1,160 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.55 per kVAh
100 kW1.2 lakh units1,000 sq m₹6.4 lakh
500 kW5.8 lakh units5,000 sq m₹32.2 lakh
1 MW11.6 lakh units10,000 sq m₹64.4 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Resubelpara

For a rooftop array in Resubelpara the strongest month is March, at about 124 units for each kW installed, and the weakest is July, at about 79. For a ground-mounted array at a 32° tilt the strongest month is March (about 131) and the weakest is June (about 72). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January103127
February105120
March124131
April109105
May9990
June8072
July7972
August8278
September8384
October98108
November97117
December94118

Somaya Solar projects near Resubelpara

These are the Somaya Solar projects closest to Resubelpara, with straight-line distances. They are shown as references and are not in Resubelpara unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1060 km from Resubelpara. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1080 km from Resubelpara. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1200 km from Resubelpara. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Resubelpara

Which electricity company handles solar connections in Resubelpara?

Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies North Garo Hills district.

Is net metering available for factories and commercial buildings in Resubelpara?

Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.

How much electricity does a solar plant generate in Resubelpara?

About 1,160 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Resubelpara?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1330 km from Resubelpara in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1060 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Resubelpara

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image