PM-KUSUM Solar Plant EPC in Assam

Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Assam and what we do on such a project.

What PM-KUSUM covers

PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components.

  • Component A: decentralised solar plants of up to 2 MW on farmers' land.
  • Component B: solar pumps for agriculture.
  • Component C: solarisation of grid-connected agriculture pumps, including feeder-level solarisation.

Who runs PM-KUSUM in Assam

In Assam, the Assam Energy Development Agency (AEDA) implements Component B, for standalone solar pumps. MNRE allotted it 4,000 pumps. Who runs Components A and C, and any tariff AERC fixed for them, could not be confirmed.

  • Progress reported to the Lok Sabha up to 30 June 2026: no capacity under Component A and no pumps solarised under Component C. Under Component B, 1,238 pumps in 2025-26 and 357 pumps in 2026-27, 1,595 in all.
  • The central government has extended the scheme to 31 March 2027 for all components.

What a PM-KUSUM plant produces in Assam

Solar output changes across Assam with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,170 to 1,320 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Barpeta1,1801,240
Barpeta Road1,1401,200
Bilasipara1,1701,240
Biswanath Chariali1,1501,220
Bongaigaon1,1601,230
Chapar1,1501,220
Dergaon1,1501,210
Dhekiajuli1,1301,200
Dhing1,1601,230
Dhubri1,1701,250
Dibrugarh1,1501,220
Digboi1,1201,190
Diphu1,2101,270
Dum Duma1,1301,200
Garamur1,1501,220
Gauripur1,1801,250
Goalpara1,1601,230
Golaghat1,1501,210
Guwahati1,1701,240
Haflong1,2601,320
Hailakandi1,2301,290
Hamren1,1801,230
Hojai1,1901,250
Jorhat1,1501,210
Kokrajhar1,1501,220
Lanka1,2001,250
Mangaldai1,1601,230
Margherita1,1301,200
Mariani1,1501,210
Morigaon1,1701,230
Mushalpur1,1701,240
Nagaon1,1701,240
Nalbari1,1801,260
North Lakhimpur1,1401,210
Rangia1,1801,250
Sibsagar1,1501,210
Silapathar1,1001,170
Silchar1,2301,290
Sonari1,1501,220
Tezpur1,1601,230
Tinsukia1,1401,210

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What Somaya Solar does on a PM-KUSUM plant

Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.

  • Site check of the land and its distance from the substation
  • Plant design and equipment supply
  • Installation, testing and commissioning
  • The line to the substation and coordination with the electricity supplier
  • Support with the documents the implementing agency asks for

More detail: PM-KUSUM across India.

Questions about solar projects in Assam

Who do I apply to for PM-KUSUM in Assam?

In Assam, the Assam Energy Development Agency (AEDA) implements Component B, for standalone solar pumps. MNRE allotted it 4,000 pumps. Who runs Components A and C, and any tariff AERC fixed for them, could not be confirmed.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Assam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image