Commercial and Industrial Rooftop Solar in Assam

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Assam. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Metering rules for business rooftops in Assam

In Assam, rooftop solar is governed by the AERC (Grid Interactive Solar PV Systems) Regulations, 2019, notified on 6 August 2019 and amended on 18 June 2024. APDCL has asked the regulator to cut net metering benefits and stop paying for surplus energy. AERC has not changed the rules. On 5 August 2026 it told APDCL to keep processing applications under the existing rules while the petition is pending.

  • A system may be from 1 kWp to 1,000 kWp. For an HT consumer it is limited to 100% of the connected load or contract demand, where the grid connection is technically feasible.
  • The total rooftop capacity on one distribution transformer may not exceed 80% of the transformer's capacity.
  • Excess energy in a billing period is carried forward as credit. At the end of the settlement period, APDCL pays for unadjusted surplus at the average power purchase cost (APPC) approved by AERC, and the carried-over balance is reset to zero.
  • APDCL's Petition No. 09/2026 asks that net metering be limited to residential consumers up to 10 kWp and that unadjusted surplus at year end not be paid for. AERC found the financial analysis incomplete and, pending a decision, told APDCL not to defer or reject applications because of the petition.
  • The State Solar Policy 2025, clause 10.1 (as quoted in the order), says net metering is for residential consumers up to 10 kW and net billing for all categories, including residential above 10 kW. It adds that the arrangement follows AERC regulations and orders. Confirm with APDCL which arrangement applies to a commercial or industrial application.
  • Deemed acceptance and automatic load enhancement apply to rooftop systems up to 10 kW under the central rules, and AERC directed APDCL to operationalise them.
  • The state clean energy policy says rooftop projects can go under net metering, net billing, virtual net metering or group net metering as per the AERC regulations.

Output and bill value for a rooftop plant in Assam

Solar output changes across Assam with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,100 to 1,260 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Barpeta1,1801,240
Barpeta Road1,1401,200
Bilasipara1,1701,240
Biswanath Chariali1,1501,220
Bongaigaon1,1601,230
Chapar1,1501,220
Dergaon1,1501,210
Dhekiajuli1,1301,200
Dhing1,1601,230
Dhubri1,1701,250
Dibrugarh1,1501,220
Digboi1,1201,190
Diphu1,2101,270
Dum Duma1,1301,200
Garamur1,1501,220
Gauripur1,1801,250
Goalpara1,1601,230
Golaghat1,1501,210
Guwahati1,1701,240
Haflong1,2601,320
Hailakandi1,2301,290
Hamren1,1801,230
Hojai1,1901,250
Jorhat1,1501,210
Kokrajhar1,1501,220
Lanka1,2001,250
Mangaldai1,1601,230
Margherita1,1301,200
Mariani1,1501,210
Morigaon1,1701,230
Mushalpur1,1701,240
Nagaon1,1701,240
Nalbari1,1801,260
North Lakhimpur1,1401,210
Rangia1,1801,250
Sibsagar1,1501,210
Silapathar1,1001,170
Silchar1,2301,290
Sonari1,1501,220
Tezpur1,1601,230
Tinsukia1,1401,210

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Questions about solar projects in Assam

Is net metering available for factories and commercial buildings in Assam?

In Assam, rooftop solar is governed by the AERC (Grid Interactive Solar PV Systems) Regulations, 2019, notified on 6 August 2019 and amended on 18 June 2024. APDCL has asked the regulator to cut net metering benefits and stop paying for surplus energy. AERC has not changed the rules. On 5 August 2026 it told APDCL to keep processing applications under the existing rules while the petition is pending.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Assam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.