Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Haflong, Assam.

Haflong at a glance for solar projects

District and stateDima Hasao district, Assam
Electricity supplyAssam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Dima Hasao district.
Electricity regulatorAssam Electricity Regulatory Commission (AERC)
State renewable energy agencyAssam Energy Development Agency (AEDA)
State solar policyAssam Integrated Clean Energy Policy, 2025 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesRooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand
Modelled solar outputabout 1,260 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1590 km from Haflong in a straight line

Solar services in Haflong

Local points for solar projects in Haflong

The Government of India's One District One Product (ODOP) list names Ginger as the product of Dima Hasao district.

Solar output in Haflong

A solar plant in Haflong is modelled to produce about 1,260 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.09 per kWh
100 kW1.3 lakh units1,000 sq m₹10.2 lakh
500 kW6.3 lakh units5,000 sq m₹51.0 lakh
1 MW12.6 lakh units10,000 sq m₹1.02 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Haflong

For a rooftop array in Haflong the strongest month is March, at about 132 units for each kW installed, and the weakest is August, at about 87. For a ground-mounted array at a 31° tilt the strongest month is March (about 138) and the weakest is June (about 79). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January112137
February112127
March132138
April121117
May112102
June8979
July8879
August8782
September9495
October103113
November104124
December104129

Somaya Solar projects near Haflong

These are the Somaya Solar projects closest to Haflong, with straight-line distances. They are shown as references and are not in Haflong unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1290 km from Haflong. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1340 km from Haflong. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1460 km from Haflong. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Haflong

Which electricity company handles solar connections in Haflong?

Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Dima Hasao district.

Is net metering available for factories and commercial buildings in Haflong?

Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.

How much electricity does a solar plant generate in Haflong?

About 1,260 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Haflong?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1590 km from Haflong in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1290 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Haflong

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.