Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Jiribam, Manipur.

Jiribam at a glance for solar projects

District and stateJiribam district, Manipur
Electricity supplyManipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Jiribam district.
Electricity regulatorManipur Electricity Regulatory Commission (MnERC)
State renewable energy agencyManipur Renewable Energy Development Agency (MANIREDA)
Rooftop metering for businessesNet billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW
Modelled solar outputabout 1,240 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1610 km from Jiribam in a straight line

Solar services in Jiribam

Local points for solar projects in Jiribam

The Government of India's One District One Product (ODOP) list names Bamboo as the product of Jiribam district.

Solar output in Jiribam

A solar plant in Jiribam is modelled to produce about 1,240 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry (HT Category 5), contract demand above 125 kVA energy charge of ₹9.85 per kVAh (MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹105 per kVA per month on the billing demand also applies. Option-2 time-of-day rates per kVAh: ₹7.88 from 9 AM to 5 PM, ₹11.82 from 6 to 9 AM and from 5 to 10 PM, and ₹9.85 from 10 PM to 6 AM; the consumer can start it only when MSPDCL has the metering and billing system ready. The schedule applies throughout the state. The corrigendum of 17 June 2026 changes only pole and tower usage charges.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.85 per kVAh
100 kW1.2 lakh units1,000 sq m₹12.2 lakh
500 kW6.2 lakh units5,000 sq m₹61.1 lakh
1 MW12.4 lakh units10,000 sq m₹1.22 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Jiribam

For a rooftop array in Jiribam the strongest month is March, at about 131 units for each kW installed, and the weakest is July, at about 85. For a ground-mounted array at a 31° tilt the strongest month is January (about 137) and the weakest is June (about 77). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January113137
February112127
March131137
April120116
May110100
June8777
July8577
August8580
September9293
October101111
November103122
December104129

Somaya Solar projects near Jiribam

These are the Somaya Solar projects closest to Jiribam, with straight-line distances. They are shown as references and are not in Jiribam unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1290 km from Jiribam. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1360 km from Jiribam. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1480 km from Jiribam. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Jiribam

Which electricity company handles solar connections in Jiribam?

Manipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Jiribam district.

Is net metering available for factories and commercial buildings in Jiribam?

Net billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW. The rule is the same across Manipur.

How much electricity does a solar plant generate in Jiribam?

About 1,240 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Jiribam?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1610 km from Jiribam in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1290 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jiribam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.