Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Jiribam, Manipur. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Jiribam at a glance for solar projects

District and stateJiribam district, Manipur
Electricity supplyManipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Jiribam district.
Electricity regulatorManipur Electricity Regulatory Commission (MnERC)
State renewable energy agencyManipur Renewable Energy Development Agency (MANIREDA)
Rooftop metering for businessesNet billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW
Modelled solar outputabout 1,240 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1610 km from Jiribam in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Jiribam

In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.

The size limits, charges and other conditions for Manipur are on the page Solar EPC Company in Manipur.

In Jiribam the application for connection and metering goes to MSPDCL.

What a plant produces in Jiribam

A solar plant in Jiribam is modelled to produce about 1,240 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry (HT Category 5), contract demand above 125 kVA energy charge of ₹9.85 per kVAh (MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹105 per kVA per month on the billing demand also applies. Option-2 time-of-day rates per kVAh: ₹7.88 from 9 AM to 5 PM, ₹11.82 from 6 to 9 AM and from 5 to 10 PM, and ₹9.85 from 10 PM to 6 AM; the consumer can start it only when MSPDCL has the metering and billing system ready. The schedule applies throughout the state. The corrigendum of 17 June 2026 changes only pole and tower usage charges.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.85 per kVAh
100 kW1.2 lakh units1,000 sq m₹12.2 lakh
500 kW6.2 lakh units5,000 sq m₹61.1 lakh
1 MW12.4 lakh units10,000 sq m₹1.22 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Jiribam

The Government of India's One District One Product (ODOP) list names Bamboo as the product of Jiribam district.

EPC projects by Somaya Solar near Jiribam

These are the Somaya Solar projects closest to Jiribam, with straight-line distances. They are shown as references and are not in Jiribam unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1290 km from Jiribam. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1360 km from Jiribam. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1480 km from Jiribam. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Jiribam

Which electricity company handles solar connections in Jiribam?

Manipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Jiribam district.

Is net metering available for factories and commercial buildings in Jiribam?

Net billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW. The rule is the same across Manipur.

How much electricity does a solar plant generate in Jiribam?

About 1,240 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Jiribam?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1610 km from Jiribam in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1290 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jiribam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image