Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Manipur. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Manipur at a glance for solar projects
| Electricity regulator | Manipur Electricity Regulatory Commission (MnERC) |
|---|---|
| State renewable energy agency | Manipur Renewable Energy Development Agency (MANIREDA) |
| Electricity distribution | MSPDCL (The whole state of Manipur, including Imphal) |
| Rooftop metering for businesses | Net billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Manipur
In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.
- Net metering is open only to domestic, agricultural, group housing, charitable institutions, government buildings including schools and local authority buildings. A commercial or industrial consumer uses net billing, gross metering or behind-the-meter.
- Net billing is open to all categories, from 1 kW up to the sanctioned load or contract demand or 500 kW, whichever is lower.
- Under net billing, imports are billed at the retail tariff and exports are credited at 100% of the weighted average tariff of competitively bid solar projects of 5 MW or above, or at the average power purchase cost of the year n-2 if no such tariff exists. A net credit at the end of the financial year is paid to the consumer.
- Gross metering is open to all categories up to 10 MW. If the plant is larger than the sanctioned load or at a separate site, the consumer pays for the service line and network upgrades.
- Group net metering and virtual net metering, from 5 kW, are only for the consumer categories eligible for net metering. They are not open to commercial and industrial consumers.
- A system above 10 kW must have battery storage of at least 20% of its energy generation potential.
- Energy from a system on the consumer's premises under net metering, net billing, gross metering or behind-the-meter is exempt from banking, wheeling, cross-subsidy and additional surcharge charges.
- The cumulative capacity connected to a feeder or transformer follows the State Distribution Code or other regulations; these regulations give no percentage.
What a plant produces in Manipur
Solar output changes across Manipur with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,230 to 1,270 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bishnupur | 1,250 | 1,310 |
| Churachandpur | 1,250 | 1,310 |
| Imphal | 1,260 | 1,320 |
| Jiribam | 1,240 | 1,310 |
| Kakching | 1,250 | 1,300 |
| Kamjong | 1,230 | 1,290 |
| Kangpokpi | 1,260 | 1,330 |
| Mayang Imphal | 1,250 | 1,310 |
| Nambol | 1,250 | 1,310 |
| Pherzawl | 1,270 | 1,330 |
| Thoubal | 1,250 | 1,310 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Manipur
Is net metering available for factories and commercial buildings in Manipur?
In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Manipur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- MANIREDA website, About MANIREDA
- Manipur Electricity Regulatory Commission (MnERC), set up on 23 July 2024; before that Manipur was regulated by the Joint Electricity Regulatory Commission for Manipur and Mizoram
- MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notification of 28 August 2026 (Manipur Gazette Extraordinary No. 190, 3 September 2026)
- MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026 (paragraph 1.2)
- PVGIS, European Commission Joint Research Centre (solar output model)