Somaya Solar Solutions Limited delivers turnkey solar projects in Manipur: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Manipur
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Manipur
In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.
- Net metering is open only to domestic, agricultural, group housing, charitable institutions, government buildings including schools and local authority buildings. A commercial or industrial consumer uses net billing, gross metering or behind-the-meter.
- Net billing is open to all categories, from 1 kW up to the sanctioned load or contract demand or 500 kW, whichever is lower.
- Under net billing, imports are billed at the retail tariff and exports are credited at 100% of the weighted average tariff of competitively bid solar projects of 5 MW or above, or at the average power purchase cost of the year n-2 if no such tariff exists. A net credit at the end of the financial year is paid to the consumer.
- Gross metering is open to all categories up to 10 MW. If the plant is larger than the sanctioned load or at a separate site, the consumer pays for the service line and network upgrades.
- Group net metering and virtual net metering, from 5 kW, are only for the consumer categories eligible for net metering. They are not open to commercial and industrial consumers.
- A system above 10 kW must have battery storage of at least 20% of its energy generation potential.
- Energy from a system on the consumer's premises under net metering, net billing, gross metering or behind-the-meter is exempt from banking, wheeling, cross-subsidy and additional surcharge charges.
- The cumulative capacity connected to a feeder or transformer follows the State Distribution Code or other regulations; these regulations give no percentage.
What to expect from the plant in Manipur
Solar output changes across Manipur with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,230 to 1,270 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bishnupur | 1,250 | 1,310 |
| Churachandpur | 1,250 | 1,310 |
| Imphal | 1,260 | 1,320 |
| Jiribam | 1,240 | 1,310 |
| Kakching | 1,250 | 1,300 |
| Kamjong | 1,230 | 1,290 |
| Kangpokpi | 1,260 | 1,330 |
| Mayang Imphal | 1,250 | 1,310 |
| Nambol | 1,250 | 1,310 |
| Pherzawl | 1,270 | 1,330 |
| Thoubal | 1,250 | 1,310 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Manipur
Is net metering available for factories and commercial buildings in Manipur?
In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Manipur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.