Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kamjong, Manipur.

Kamjong at a glance for solar projects

District and stateKamjong district, Manipur
Electricity supplyManipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Kamjong district.
Electricity regulatorManipur Electricity Regulatory Commission (MnERC)
State renewable energy agencyManipur Renewable Energy Development Agency (MANIREDA)
Rooftop metering for businessesNet billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW
Modelled solar outputabout 1,230 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1740 km from Kamjong in a straight line

Solar services in Kamjong

Local points for solar projects in Kamjong

The Government of India's One District One Product (ODOP) list names King Chilli as the product of Kamjong district.

Solar output in Kamjong

A solar plant in Kamjong is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry (HT Category 5), contract demand above 125 kVA energy charge of ₹9.85 per kVAh (MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹105 per kVA per month on the billing demand also applies. Option-2 time-of-day rates per kVAh: ₹7.88 from 9 AM to 5 PM, ₹11.82 from 6 to 9 AM and from 5 to 10 PM, and ₹9.85 from 10 PM to 6 AM; the consumer can start it only when MSPDCL has the metering and billing system ready. The schedule applies throughout the state. The corrigendum of 17 June 2026 changes only pole and tower usage charges.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹9.85 per kVAh
100 kW1.2 lakh units1,000 sq m₹12.1 lakh
500 kW6.2 lakh units5,000 sq m₹60.6 lakh
1 MW12.3 lakh units10,000 sq m₹1.21 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Kamjong

For a rooftop array in Kamjong the strongest month is March, at about 132 units for each kW installed, and the weakest is July, at about 81. For a ground-mounted array at a 30° tilt the strongest month is March (about 138) and the weakest is July (about 74). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January110133
February112127
March132138
April125121
May115105
June8677
July8174
August8580
September8989
October93101
November99117
December100123

Somaya Solar projects near Kamjong

These are the Somaya Solar projects closest to Kamjong, with straight-line distances. They are shown as references and are not in Kamjong unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1430 km from Kamjong. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1490 km from Kamjong. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1610 km from Kamjong. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Kamjong

Which electricity company handles solar connections in Kamjong?

Manipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Kamjong district.

Is net metering available for factories and commercial buildings in Kamjong?

Net billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW. The rule is the same across Manipur.

How much electricity does a solar plant generate in Kamjong?

About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Kamjong?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1740 km from Kamjong in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1430 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kamjong

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.