Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Kamjong, Manipur as an EPC contractor: engineering, supply, construction and commissioning.
What Manipur's policy says about large solar plants
Under the Open Access Regulations, 2010 that MnERC lists among its regulations, open access is allowed for consumers with a connected load of 1 MW and above. The Green Energy Open Access charges regulations, also on MnERC's list, cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
The charges, exemptions and conditions for Manipur are on the page Utility-Scale Solar in Manipur.
Output and land at megawatt scale in Kamjong
A solar plant in Kamjong is modelled to produce about 1,290 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (30°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 64.5 lakh units | 20 to 25 acres |
| 10 MW | 1.29 crore units | 40 to 50 acres |
| 25 MW | 3.23 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Kamjong
These are the Somaya Solar projects closest to Kamjong, with straight-line distances. They are shown as references and are not in Kamjong unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1430 km from Kamjong. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1650 km from Kamjong. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kamjong
Which electricity company handles solar connections in Kamjong?
Manipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Kamjong district.
How much electricity does a solar plant generate in Kamjong?
About 1,290 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.9 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kamjong?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1740 km from Kamjong in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1430 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kamjong
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026 (Table 10-4); Open Access Regulations, 2010 and Green Energy Open Access Charges Regulations, 2024 as listed on MnERC's regulations page
- MnERC tariff order for MSPDCL, FY 2026-27 (14 May 2026), para 1.2
- PVGIS, European Commission Joint Research Centre (solar output model)